Jai Balaji Jyoti Steels Odisha plant
From Global Energy Monitor
This article is part of the Global Steel Plant Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Jai Balaji Jyoti Steels Odisha plant is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in Sundargarh, Odisha, India.
Location
The map below shows the exact location of the plant in Sundargarh, Odisha, India:
- Location: Village-Tainser, Tehsil- Lathikata, District-Sundargarh, Odisha -770 037, India
- Coordinates (WGS 84): 22.085338, 84.861840 (exact)
Background
Jai Balaji Jyoti Steels Limited is an integrated, incorporated on 21 April 2003. The plant houses DRI kilns and induction furnaces.[1] In 2021, the company announced its plans to expand the plant's induction furnace and DRI capacities and adding an EAF unit.[2][1]
Plant Details
Table 1: General Plant Details
Phase | Plant status | Announced date | Start date | Workforce size | Power source |
---|---|---|---|---|---|
Main plant | Operating[3] | – | 2003[3] | 650[3] | – |
Expansion | Announced[3] | 2021[3] | 2030[4] | 1250[3] | 110 MW Captive power plant[5] |
Table 2: Ownership and Parent Company Information
Phase | Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|---|
Main plant | Jai Balaji Industries Ltd [100.0%] | 4295873993 [100%] | E100000130703 [100%] | Jai Balaji Jyoti Steels Ltd[3] | 5037247687 | E100000130984 |
Table 3: Process and Products
Phase | Steel product category | Steel products | Main production equipment | Detailed production equipment |
---|---|---|---|---|
Main plant | crude; semi-finished; finished rolled[3] | DRI; billets; bars; wire rods; iron ore[3] | DRI, EAF, other[3] | DRI plant (coal based); IF; EAF[3] |
Expansion | crude; semi-finished; finished rolled[3] | DRI; billets; bars; wire rods; iron ore[3] | DRI, EAF, other[3] | DRI plant; IF; EAF[3] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
Main plant | operating | – | 92 TTPA |
Expansion | announced | 66 TTPA[3] | 330 TTPA[3] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum)
Phase | Capacity operating status* | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
Main plant | operating | 120 TTPA[3][3][3][3] | 120 TTPA[3][3][3][3] |
Expansion | announced | 594 TTPA[3][3][3] | 594 TTPA[3][3][3] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Phase | Ferronickel | Pellets |
---|---|---|
Main plant | –[3] | –[3] |
Expansion | 112 TTPA[3] | 1600 TTPA[3] |
Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)
Year | Total (all routes) |
---|---|
2020 | – |
2021 | 27 TTPA[6] |
2022 | 41 TTPA[7] |
Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)
Year | DRI Production | Total (all routes) |
---|---|---|
2020 | – | – |
2021 | 64 TTPA[6] | 64 TTPA |
2022 | 76 TTPA[7] | 76 TTPA |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "Pre-feasibility report for Expansion of Integrated Steel Plant at Village-Tainser, Tehsil- Lathikata, District-Sundargarh, Odisha -770 037" (PDF). MoEF&CC. Retrieved 16 October, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "Latest developments in steelmaking capacity" (PDF). OECD. 2022. Retrieved 16 October, 2023.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 3.32 3.33 3.34 (PDF) https://web.archive.org/web/20240125061828/https://environmentclearance.nic.in/writereaddata/Online/TOR/16_Sep_2021_13441333068293043PFR.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240111044815/https://environmentclearance.nic.in/writereaddata/Online/TOR/16_Sep_2021_13441333068293043PFR.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20221004203054/https://jaibalajigroup.com/wp-content/uploads/2022/09/Annual-Report-2021-22.pdf. Archived from the original (PDF) on 04 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 (PDF) https://web.archive.org/web/20240111061848/https://jaibalajigroup.com/wp-content/uploads/2023/08/24th-Annual-Report-2022-23.pdf. Archived from the original (PDF) on 11 January 2024.
{{cite web}}
: Missing or empty|title=
(help)