Jai Balaji Jyoti Steels Odisha plant is a direct reduced iron-electric arc furnace (DRI-EAF) steel plant operating in Sundargarh, Odisha, India.

Location

The map below shows the exact location of the plant in Sundargarh, Odisha, India:

Loading map...
  • Location: Village-Tainser, Tehsil- Lathikata, District-Sundargarh, Odisha -770 037, India
  • Coordinates (WGS 84): 22.085338, 84.861840 (exact)

Background

Jai Balaji Jyoti Steels Limited is an integrated, incorporated on 21 April 2003. The plant houses DRI kilns and induction furnaces.[1] In 2021, the company announced its plans to expand the plant's induction furnace and DRI capacities and adding an EAF unit.[2][1]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Start date Workforce size Power source
Main plant Operating[3] 2003[3] 650[3]
Expansion Announced[3] 2021[3] 2030[4] 1250[3] 110 MW Captive power plant[5]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company PermID Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Jai Balaji Industries Ltd [100.0%] 4295873993 [100%] E100000130703 [100%] Jai Balaji Jyoti Steels Ltd[3] 5037247687 E100000130984

Table 3: Process and Products

Phase Steel product category Steel products Main production equipment Detailed production equipment
Main plant crude; semi-finished; finished rolled[3] DRI; billets; bars; wire rods; iron ore[3] DRI, EAF, other[3] DRI plant (coal based); IF; EAF[3]
Expansion crude; semi-finished; finished rolled[3] DRI; billets; bars; wire rods; iron ore[3] DRI, EAF, other[3] DRI plant; IF; EAF[3]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 92 TTPA
Expansion announced 66 TTPA[3] 330 TTPA[3]

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Sponge iron/DRI capacity Nominal iron capacity (total)
Main plant operating 120 TTPA[3][3][3][3] 120 TTPA[3][3][3][3]
Expansion announced 594 TTPA[3][3][3] 594 TTPA[3][3][3]

Table 6: Upstream Products Production Capacities (thousand tonnes per annum)

Phase Ferronickel Pellets
Main plant [3] [3]
Expansion 112 TTPA[3] 1600 TTPA[3]

Table 7: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year Total (all routes)
2020
2021 27 TTPA[6]
2022 41 TTPA[7]

Table 8: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year DRI Production Total (all routes)
2020
2021 64 TTPA[6] 64 TTPA
2022 76 TTPA[7] 76 TTPA

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "Pre-feasibility report for Expansion of Integrated Steel Plant at Village-Tainser, Tehsil- Lathikata, District-Sundargarh, Odisha -770 037" (PDF). MoEF&CC. Retrieved 16 October, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. "Latest developments in steelmaking capacity" (PDF). OECD. 2022. Retrieved 16 October, 2023. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 3.28 3.29 3.30 3.31 3.32 3.33 3.34 (PDF) https://web.archive.org/web/20240125061828/https://environmentclearance.nic.in/writereaddata/Online/TOR/16_Sep_2021_13441333068293043PFR.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://www.oecd.org/industry/ind/latest-developments-in-steelmaking-capacity-2022.pdf. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://web.archive.org/web/20240111044815/https://environmentclearance.nic.in/writereaddata/Online/TOR/16_Sep_2021_13441333068293043PFR.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 (PDF) https://web.archive.org/web/20221004203054/https://jaibalajigroup.com/wp-content/uploads/2022/09/Annual-Report-2021-22.pdf. Archived from the original (PDF) on 04 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 (PDF) https://web.archive.org/web/20240111061848/https://jaibalajigroup.com/wp-content/uploads/2023/08/24th-Annual-Report-2022-23.pdf. Archived from the original (PDF) on 11 January 2024. {{cite web}}: Missing or empty |title= (help)

Resources