Jaisalmer Manufacturing (Azure Power) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Jaisalmer Manufacturing (Azure Power) solar farm is a solar photovoltaic (PV) farm in pre-construction in Fatehgarh, Jaisalmer, Rajasthan, India.
Project Details
Table 1: Phase-level project details for Jaisalmer Manufacturing (Azure Power) solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1] | 2024 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
10 | Pre-construction[1] | 2025 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
11 | Pre-construction[1] | 2025 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
12 | Pre-construction[1] | 2025 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
13 | Pre-construction[1] | 2025 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
14 | Pre-construction[1] | 2025 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
15 | Pre-construction[1] | 2025 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
16 | Pre-construction[1] | 2025 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
17 | Pre-construction[1] | 2026 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
18 | Pre-construction[1] | 2026 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
19 | Pre-construction[1] | 2026 (planned)[1] | 83 MWac[1] | PV[2] | Azure Power [100%][1] |
2 | Pre-construction[1] | 2024 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
3 | Pre-construction[1] | 2024 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
4 | Pre-construction[1] | 2024 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
5 | Pre-construction[1] | 2024 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
6 | Pre-construction[1] | 2024 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
7 | Pre-construction[1] | 2024 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
8 | Pre-construction[1] | 2024 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
9 | Pre-construction[1] | 2025 (planned)[1] | 125 MWac[1] | PV[2] | Azure Power [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Jaisalmer Manufacturing (Azure Power) solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
10 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
11 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
12 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
13 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
14 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
15 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
16 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
17 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
18 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
19 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
2 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
3 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
4 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
5 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
6 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
7 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
8 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
9 | Fatehgarh, Jaisalmer, Rajasthan, India[1] | 26.6899, 71.2766 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.000 1.001 1.002 1.003 1.004 1.005 1.006 1.007 1.008 1.009 1.010 1.011 1.012 1.013 1.014 1.015 1.016 1.017 1.018 1.019 1.020 1.021 1.022 1.023 1.024 1.025 1.026 1.027 1.028 1.029 1.030 1.031 1.032 1.033 1.034 1.035 1.036 1.037 1.038 1.039 1.040 1.041 1.042 1.043 1.044 1.045 1.046 1.047 1.048 1.049 1.050 1.051 1.052 1.053 1.054 1.055 1.056 1.057 1.058 1.059 1.060 1.061 1.062 1.063 1.064 1.065 1.066 1.067 1.068 1.069 1.070 1.071 1.072 1.073 1.074 1.075 1.076 1.077 1.078 1.079 1.080 1.081 1.082 1.083 1.084 1.085 1.086 1.087 1.088 1.089 1.090 1.091 1.092 1.093 1.094 1.095 1.096 1.097 1.098 1.099 1.100 1.101 1.102 1.103 1.104 1.105 1.106 1.107 1.108 1.109 1.110 1.111 1.112 1.113 (PDF) https://web.archive.org/web/20240126153523/https://cea.nic.in/wp-content/uploads/rpm_division/2023/05/Report_on_Under_Construction_Renewable_Energy_Projects_March_2023.pdf. Archived from the original (PDF) on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 https://web.archive.org/web/20240207105410/https://www.mercomindia.com/adani-green-worlds-largest-solar-bid. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)