Jaybird hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Jaybird hydroelectric plant is an operating hydroelectric power plant in Camino, El Dorado County, California, United States.

Project Details

Table 1: Project details for Jaybird hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Technology type Owner Operator
Operating[1] 1961[1] 162 MW[1] 2 x 80.8 MW[1] Conventional storage[1] Sacramento Municipal Utility District [100%][2] Sacramento Municipal Utility District[2]

Location

Table 2: Location details for Jaybird hydroelectric plant

Location River Coordinates (WGS 84)
Camino, El Dorado County, California, United States[1][2] Silver Creek[2] 38.834, -120.532 (exact)[1][2]

The map below shows the exact location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240928140622/https://www.eia.gov/electricity/data/eia860m/archive/xls/november_generator2022.xlsx. Archived from the original on 2024-09-28. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)