Jhilmili Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Jhilmili Coal Mine is an operating coal mine in Sorga, Korea, Chhattisgarh, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Jhilmili Coal Mine | Sorga, Korea, Chhattisgarh, India | 23.350314, 82.728807 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
0[1] | 0.31[2] | 2022[2] | Underground | – | 9.72 | 300* | 867* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
20.45[1] | 2019[1] | – | Jhilimili | Subbituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
South Eastern Coalfields Ltd | Coal India Ltd [100.0%] | India |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background on Mine
The Pandavpara Underground Coal Mine Project has a designed capacity of 0.5 MTPA on a mining lease area of 972.036 ha. It is operated by South Eastern Coalfields Limited, is located in village Sorga, Tehsil Baikunthpur, District Korea, State Chhattisgarh, India. EC was obtained on 30 January 1995 for 0.30 MTPA project involving the existing total lease area of 972.036 ha, of which 201.131 ha is agricultural land, 752.823 ha is forestland and 18.082 ha is govt. land. The lease area has 4 seams – Seam V and IV B of Jhilmili UGP and Seams II and III of Pandavpara falling within the same mine block. The project received its environment clearance for an expansion in capacity from 0.3 MTPA to 0.50 MTPA on 15 April 2009.[3]
Expansion Details
- Status:
- Size of Expansion:
- Permits and Applications:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 (PDF) https://www.secl-cil.in/writereaddata/Envt_audit_report_JHILIMILI%20UG_EAS19.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20240129173121/https://coal.nic.in/sites/default/files/2023-05/23-05-2023.pdf. Archived from the original (PDF) on 29 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Environment Clearance for Expansion of Jhilmili Underground Coal Mine Project, MoEF&CC India, 15 April 2009