Jili Baikuang power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Jili Baikuang power station (吉利百矿集团有限公司清洁高效煤电项目) is a permitted power station in Toutang Town, Tianyang, Baise, Guangxi, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jili Baikuang power station Toutang Town, Tianyang, Baise, Guangxi, China 23.7849583, 106.8202878 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 permitted coal: unknown 660 ultra-supercritical 2025 (planned)
Unit 2 permitted coal: unknown 660 ultra-supercritical 2025 (planned)

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Guangxi Baikuang Chaoyuan Power Generation Co Ltd [100%] Guangxi Baikuang Chaoyuan Power Generation Co Ltd [100.0%]
Unit 2 Guangxi Baikuang Chaoyuan Power Generation Co Ltd [100%] Guangxi Baikuang Chaoyuan Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s):

Background

On August 3, 2022, the Development and Reform Commission of Guangxi Zhuang Autonomous Region issued an official document (桂发改电力〔2022〕829 号) regarding coal power projects for its provincial 14th Five-Year Plan for the energy sector. Baise Mining Group Co., Ltd.’s ‘suppress small to scale up big’ 2 x 660 MW coal power project is one of them. Guangxi Baikuang Chaoyuan Power Generation Co., Ltd. was set up to develop and run the construction and operation of the project.[2]

Echoing the National Development and Reform Commission's call that the new coal power adopts the principle of "establishing before reforming, ultra-supercritical, and not selecting new sites", Jili Baikuang power station was set to be built at the reserved expansion site of Baise Tianyang power station.[2]

The project was granted permission (桂发改电力〔2022〕1327号) to build on 28 December 2022 and it was also in 2023 Guangxi Energy Infrastructure Construction Work Plan. [3]

Articles and Resources

References

  1. https://web.archive.org/web/20240125084944/https://mp.weixin.qq.com/s/YblNsJQA7TvItC3gruyfKQ. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 "火电|总投资55.37亿元!!2×660MW!广西新增清洁高效煤电项目!". 能源电力新观察. 2023-06-25. Retrieved 2023-07-20.{{cite web}}: CS1 maint: url-status (link)
  3. 广西壮族自治区发展和改革委员会 (2023-04-03). "广西壮族自治区发展和改革委员会关于印发《广西能源基础设施建设2023年工作推进方案》的通知". 广西壮族自治区发展和改革委员会. Retrieved 2023-07-20.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.