Jintang-Cezi Oil Pipeline

From Global Energy Monitor
Part of the
Global Oil Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Jintang-Cezi Oil Pipeline 金塘—册子原油管道 is an oil pipeline project currently under construction in China.[1][2][3][4]

Location

The oil pipeline is proposed to run from Jintang Island to Cezi Island, Dinghai District, Zhoushan City, Zhejiang, China.[1][2]

Loading map...

Project details

Jintang-Cezi Oil Pipeline 1(金塘—册子原油管道1)

  • Operator: 浙江石油化工有限公司Zhejiang Petroleum &Chemical Co., Ltd. (浙江石油化工有限公司)[3]
  • Owner: 浙江石油化工有限公司Zhejiang Petroleum &Chemical Co., Ltd. (浙江石油化工有限公司)[3]
  • Parent company:
  • Capacity: 20 mtpa.[2]
  • Length: 8.5 km.[1]
  • Diameter: 800mm[1]
  • Status: Construction[1]
  • Start year:
  • Cost: around 366 million RMB[2]
  • Financing:
  • Associated infrastructure:

Jintang-Cezi Oil Pipeline 2(金塘—册子原油管道2)

  • Operator: 浙江石油化工有限公司Zhejiang Petroleum &Chemical Co., Ltd. (浙江石油化工有限公司)[3]
  • Owner: 浙江石油化工有限公司Zhejiang Petroleum &Chemical Co., Ltd. (浙江石油化工有限公司)[3]
  • Parent company:
  • Capacity: 20 mtpa.[2]
  • Length: 8.5 km.[1]
  • Diameter: 800mm[1]
  • Status: Construction[1]
  • Start year:
  • Cost: around 366 million RMB[2]
  • Financing:
  • Associated infrastructure:

Jintang-Cezi Oil Pipeline 3(金塘—册子原油管道3)

  • Operator: 浙江石油化工有限公司Zhejiang Petroleum &Chemical Co., Ltd. (浙江石油化工有限公司)[3]
  • Owner: 浙江石油化工有限公司Zhejiang Petroleum &Chemical Co., Ltd. (浙江石油化工有限公司)[3]
  • Parent company:
  • Capacity: 20 mtpa.[2]
  • Length: 8.5 km.[1]
  • Diameter: 800mm[1]
  • Status: Construction[1]
  • Start year:
  • Cost: around 366 million RMB[2]
  • Financing:
  • Associated infrastructure:

Background

The Jintang-Cezi Oil Pipeline is listed under the 14th Five-Year Development Plan for Coal, Oil, and Natural Gas in Zhejiang Province, published in 2021. It is proposed with three pipelines of the same route.[2][5]

The Jintang Crude Oil Transportation and Storage Base project, with a total investment of 9 billion RMB, is expected to be completed in 2025. The project includes three components: a wharf, tank area, and oil pipelines. After the completion of the project, Zhejiang Petrochemical will establish a transportation route: Jintang - Cezi - Mamu - Yushan. [3][4]

Reference

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 "金塘原油储运基地外输管道工程举行A隧道焊接作业开工仪式". 2023-11-23. Retrieved 2025-02-06.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 省发展改革委 省能源局关于印发《浙江省煤炭石油天然气发展“十四五”规划》的通知, 浙江省发改委 浙发改规划〔2021〕212号, 2021/06/01
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "全面挖掘四千万吨炼油盈利潜力" (PDF). Retrieved 2024-01-10.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 "荣盛石化:全面挖掘四千万吨炼油盈利潜力(东方证券研报)". 2024-01-02. Retrieved 2024-01-10.{{cite web}}: CS1 maint: url-status (link)
  5. "省发展改革委 省能源局关于印发《浙江省煤炭石油天然气发展"十四五"规划》的通知". 2021-07-07. Retrieved 2025-02-06.{{cite web}}: CS1 maint: url-status (link)