Jubail 3B Solar PV Plant

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Jubail 3B Solar PV Plant (محطة الجبيل ٣ب للطاقة الشمسية) is an operating solar photovoltaic (PV) farm in Jubail, Eastern province, Saudi Arabia.

Project Details

Table 1: Phase-level project details for Jubail 3B Solar PV Plant

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2024[1] 61 MWp/dc[2] PV[3] Abdul Aziz Al Ajlan Sons Company for Commerical & Real Estate Investment [30%]; ENGIE SA [40%]; Nesma Holding Co Ltd [30%][4] Nesma Holding; Abdul Aziz Al Ajlan Sons Company for Commerical & Real Estate Investment; ENGIE[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Jubail 3B Solar PV Plant

Location Coordinates (WGS 84)
Jubail, Eastern province, Saudi Arabia[1] 27.0360, 49.5693 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 (PDF) https://engiemiddleeast.com/wp-content/uploads/Fact-Sheet_Jubail-3B.pdf. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240201135518/https://www.zawya.com/en/business/engie-led-consortium-closes-financing-for-saudi-largest-solar-powered-water-desalination-plant-rwwgf11n. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  3. https://www.egyptiansabroad.news/73644 https://energy-utilities.com/construction-work-starts-on-jubail-3b-news117707.html, https://www.egyptiansabroad.news/73644. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. 4.0 4.1 https://engiemiddleeast.com/press-releases/engie-in-saudi-arabia-reaches-financial-close-on-jubail-3b-iwp/, https://engiemiddleeast.com/press-releases/engie-in-saudi-arabia-reaches-financial-close-on-jubail-3b-iwp/ https://engiemiddleeast.com/press-releases/engie-in-saudi-arabia-reaches-financial-close-on-jubail-3b-iwp/, https://engiemiddleeast.com/press-releases/engie-in-saudi-arabia-reaches-financial-close-on-jubail-3b-iwp/, https://engiemiddleeast.com/press-releases/engie-in-saudi-arabia-reaches-financial-close-on-jubail-3b-iwp/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)