KIC Metaliks Durgapur steel plant
From Global Energy Monitor
This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
Sub-articles: |
KIC Metaliks Durgapur steel plant is a steel plant in Durgapur, Burdwan, West Bengal, India that operates blast furnace (BF), direct reduced iron (DRI), steelmaking, and electric arc furnace (EAF) technology.
Location
The map below shows the exact location of the plant in Durgapur, Burdwan, West Bengal, India:
- Location: Raturia Industrial Area
- Coordinates (WGS 84): 23.507539, 87.277914 (exact)
Plant Details
Table 1: General Plant Details
Start date | Workforce size | Power source | Iron ore source | Coal source |
---|---|---|---|---|
1998-02[1] | 421[2] | 4.7 MW WHRB CPP[3] | unknown | unknown |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Parent company GEM ID | Owner | Owner company PermID | Owner company GEM ID |
---|---|---|---|---|---|
KIC Metaliks Ltd | 4295873610 | E100002007981 | KIC Metaliks Ltd[1] | 4295873610 | E100002007981 |
Table 3: Process and Products
Main production equipment |
---|
BF; DRI; EAF; Steel other/unspecified |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Electric arc furnace steelmaking capacity | Other/unspecified steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|---|
announced | 192[4] | 406[4][1] | 598[4][1] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Capacity operating status1 | Blast furnace capacity | Sponge iron/DRI capacity | Nominal iron capacity (total) |
---|---|---|---|
announced | – | 224[4] | 224[4] |
operating | 235[5] | – | 235[5] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Sinter |
---|
360[6] |
Table 7: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year | BF production | Total (all routes) |
---|---|---|
2019 | 152[2] | 152[2] |
2020 | 175[2] | 175[2] |
2021 | 116[2] | 116[2] |
2022 | 161[2] | 161[2] |
2023 | 212[7] | 212[7] |
2024 | unknown | – |
Unit Details
Table 8: Blast Furnace Details
Unit name | Status | Start date | Furnace manufacturer and model | Current size | Current capacity (ttpa) | Decarbonization technology | Most recent relining |
---|---|---|---|---|---|---|---|
unknown BF (1) | operating[2] | 1998[2] | MECON[8] | 245.0[1] | 235[5] | Pulverized Coal Injection[9] | 2020[10] |
Table 9: Direct Reduced Iron Furnace Details
Unit name | Status | Announced date | Furnace type | Current capacity (ttpa) | Reductant |
---|---|---|---|---|---|
unknown DRI (1) | announced[1] | 2016[11] | rotary kiln[1] | 112[4] | coal[1] |
unknown DRI (2) | announced[1] | 2016[11] | rotary kiln[1] | 112[4] | coal[1] |
Table 10: Electric Arc Furnace Details
Unit name | Status | Announced date | Current capacity (ttpa) | Current size (tonnes) |
---|---|---|---|---|
unknown EAF (1) | announced[4] | 2016[11] | 192[4] | 30.0[4] |
Table 11: Electric Arc Furnace Feedstock Details
Unit name | Scrap-based |
---|---|
unknown EAF (1) | None |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 (PDF) https://www.wbpcb.gov.in/writereaddata/files/EXECUTIVE%20SUMMARY-ENGLISH_1.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 (PDF) https://www.kicmetaliks.com/wp-content/uploads/2023/10/KIC-ANNUAL-REPORT-2022-23.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.kicmetaliks.com/facilities/captive-power-plant/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 (PDF) https://environmentclearance.nic.in/writereaddata/online/RiskAssessment/25092018QCZWHCI4RD.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://www.kicmetaliks.com/about-kic-metaliks/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.kicmetaliks.com/facilities/sinter-plant/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 (PDF) https://www.kicmetaliks.com/wp-content/uploads/2024/07/Annual-Report_2024.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.kicmetaliks.com/facilities/mini-blast-furnace/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.kicmetaliks.com/facilities/others/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.kicmetaliks.com/wp-content/uploads/2023/10/KIC-ANNUAL-REPORT-2022-23.pdf https://www.business-standard.com/article/news-cm/board-of-kic-metaliks-approves-expansion-and-modernisation-of-pig-iron-plant-117120800944_1.html, https://www.kicmetaliks.com/wp-content/uploads/2023/10/KIC-ANNUAL-REPORT-2022-23.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 (PDF) https://environmentclearance.nic.in/writereaddata/Online/TOR/09_Dec_2016_135819110R3TXKG2Lprojectsummary.pdf.
{{cite web}}
: Missing or empty|title=
(help)
Resources