Kairouan Solar Plant
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Metbassta Solar PV Plant
Kairouan Solar Plant (محطة قيروان للطاقة الشمسية) is a solar photovoltaic (PV) farm under construction in Kairouan, Tunisia.
Project Details
Table 1: Phase-level project details for Kairouan Solar Plant
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Construction[1][1][2] | 2024 (planned)[3] | 100 MWac[4][5] | PV[6] | AMEA Power; TBEA Xinjiang New Energy Co (أيميا باور)[2][2] | AMEA Power; TBEA Xinjiang New Energy CO (أيميا باور)[5][7][5][7] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Kairouan Solar Plant
Location | Coordinates (WGS 84) |
---|---|
Kairouan, Kairouan, Tunisia[8] | 35.6781, 10.0963 (approximate)[8] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240207142723/https://attaqa.net/2022/03/03/%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9-%D9%81%D9%8A-%D8%AA%D9%88%D9%86%D8%B3-%D8%A5%D8%B7%D9%84%D8%A7%D9%82-%D8%B9%D8%AF%D8%A9-%D9%85%D8%B4%D8%B1%D9%88%D8%B9/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240312155718/https://africa-energy-portal.org/news/tunisia-amea-power-build-100-mw-solar-power-plant-kairouan-under-ppp. Archived from the original on 12 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240402052142/https://wiki-solar.org/. Archived from the original on 02 April 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240201094120/https://renewablesnow.com/news/tunisia-approves-500-mw-of-solar-projects-775888/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 https://web.archive.org/web/20240201094307/https://www.ameapower.com/press-release-amea-power-in-partnership-with-tbea-wins-bid-for-100mw-solar-project-in-tunisia-2/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240207104145/https://constructionreviewonline.com/news/120mw-solar-pv-gafsa-plant-to-be-constructed-in-tunisia/. Archived from the original on 07 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 7.0 7.1 https://web.archive.org/web/20220406145429/https://renewablesnow.com/news/tunisia-ratifies-deals-with-amea-power-for-100-mw-solar-project-775629/. Archived from the original on 06 April 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 https://web.archive.org/web/20240206220204/https://latitude.to/map/tn/tunisia/cities/kairouan. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)