Kajurda power station is an announced power station in Kajurda, Khambalia, Dev Bhumi Dwarka, Gujarat, India.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Kajurda power station Kajurda, Khambalia, Dev Bhumi Dwarka, Gujarat, India 22.309056, 69.707062 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 announced[2] coal: lignite[1] 600[1] unknown 2027 (planned)[1]
Unit 2 announced[2] coal: lignite[1] 600[1] unknown 2027 (planned)[1]

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Essar Power Salaya Ltd[2] Essar Global Fund Ltd
Unit 2 Essar Power Salaya Ltd[2] Essar Global Fund Ltd

Project-level coal details

  • Coal source(s): Domestic

Background

Essar Power Salaya Ltd. proposed the 2 x 600 MW coal-fired power station near Kajurda and Nana Manda villages in August 2023.[3][4] According to the project's pre-feasibility report, the Kajurda power station was proposed in the vicinity of Essar Power's other existing 2 x 600 MW coal plant in the area, Salaya power plant, to enable sharing of facilities between plants.[5] The area is also 8 km away from a protected Marine National Park.[4]

Essar Power had previously proposed a 600 MW coal plant in the Nana Manda area, the now cancelled Nana Madha power station.

Essar Power's proposal for the Kajurda power station stated that construction was likely to start in December 2023 and be complete in December 2026.[4]

In September 2023, Essar's application for Terms of Reference (TOR) was referred to the Ministry of Environment, Forest and Climate Change Expert Appraisal Committee (EAC).[3] However, the proposal was deferred during the EAC's meeting, due to the proponent's absence.[6]

As of September 2024, the project's TOR did not yet appear to have been revisited or granted by the EAC, and no further news of the project's progress was available.

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://parivesh.nic.in/newupgrade/#/report/ec-part-b?id=8218551&caf=8213547&ecId=8216549. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 (PDF) https://web.archive.org/web/20240125083752/https://parivesh.nic.in/utildoc/10141373_1694775996968.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 "Agenda for 47th Meeting of the Re-Constituted Expert Appraisal Committee (EAC) (Thermal Power Projects)," India Ministry of Environment, Forest and Climate Change, September 15, 2023
  4. 4.0 4.1 4.2 "Form-1 (Part-A)," India MoEFCC Parivesh portal, accessed October 2023
  5. "Pre-feasibility Report for Proposed Greenfield project of Coal Based Thermal Power Plant located near Kajurda Village, Taluka Khambhaliya, District Dev Bhumi Dwarka, Gujarat," available on India MoEFCC Parivesh portal, August 2023