Kakono hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Kakono hydroelectric plant is a hydroelectric power plant in pre-construction in Missenyi, Kagera, Tanzania.
Project Details
Table 1: Project details for Kakono hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|---|
Pre-construction[1] | 2028 (planned)[1] | 88 MW[1] | 2[2] | Run-of-river[1] | Tanzania Electric Supply Company LTD (TANESCO)[2] |
Location
Table 2: Location details for Kakono hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Missenyi, Kagera, Tanzania[3] | Kagera River[1] | -1.0518, 30.9332 (exact)[3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20230815020759/https://www.afrik21.africa/en/tanzania-276-million-from-the-afdb-and-afd-for-the-kakono-hydropower-plant-88-mw/. Archived from the original on 15 August 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20230608082003/https://www.enr.com/articles/56457-tanzania-hydropower-project-secures-financing. Archived from the original on 08 June 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20230330151021/https://www.pietrangeli.com/kakono-hydropower-project-tanzania. Archived from the original on 30 March 2023.
{{cite web}}
: Missing or empty|title=
(help)