Kalbar-2 power station

From Global Energy Monitor

Kalbar-2 power station is a power station in Kubu Raya regency,, West Kalimantan, Indonesia with multiple units of varying statuses, none of which are currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Kalbar-2 power station Kubu Raya regency,, West Kalimantan, Indonesia 0.168359, 109.30447 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Pre-construction[2][3][4] fossil gas: natural gas[5] 300[6] combined cycle[5] not found 2024[3]
Phase II Cancelled coal: unknown 200 subcritical 2021
Unit 1 Cancelled coal: unknown 100 subcritical 2024
Unit 2 Cancelled coal: unknown 100 subcritical 2025

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 PT PLN (Persero) [100%][1] PT PLN (Persero) [100.0%]
Phase II to be determined [100%] to be determined [100.0%]
Unit 1 to be determined [100%] to be determined [100.0%]
Unit 2 to be determined [100%] to be determined [100.0%]

Background

The project was originally proposed as a coal-fired power station, but is now planned to be gas-fired.

This project is mentioned on Table 13 of the 2015-2024 PT PLN long range supply plan, scheduled for 2020 and 2021. It originally comprised two units of 200 MW.[7]

A PT PLN September 2015 list of companies interested in mine-mouth IPP plants did not show any companies interested in the project.[8]

In the 2016-2025 long range plan, the project is reduced in size to 200 MW, with the second unit relocated to the Kalbar-3 power station. Completion is moved to 2022.[9]

In August 2016 PT PLN said it would put the Kalbar-2 plant out for tender, with the selected Project Sponsor intended to develop, finance, construct and operate the Project on a Build-Own-Operate-Transfer (BOOT) basis.[10] In August 2017 PT PLN put out another EOI for a 2 x 100 MW plant, saying the successful bidder was expected to hold majority portion for the project of fifty one percent (51%) share ownership.[11]

In the 2017-2026 plan, the project is scheduled for 2021.[12] In the 2019-2028 plan the project the two units are scheduled for 2022 and 2023.[13]

In April 2019 PT PLN Persero announced that it intended to build the plant in Bintang Mas village, Kubu Raya regency, West Kalimantan.[14]

In March 2020 the project's sponsor announced that it might be delayed as a result of the COVID-19 pandemic.[15]

In June 2021, the Indonesian government announced that it would no longer allow construction of coal-fired power stations after 2025 and updated its plans for many coal-fired projects under development. The Kalbar-2 power station is now planned to be powered by gas, with a target operation date of 2024/2025.[16]

Articles and Resources

References

  1. 1.0 1.1 (PDF) https://web.archive.org/web/20170207092750/http://datacenter.bappedakaltim.com/data/musrenbangreg/10%202016-03-08-Perspektif-Pengembangan-Sistem-Ketenagalistrikan.pdf. Archived from the original (PDF) on 07 February 2017. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. (PDF) https://energyandcleanair.org/wp/wp-content/uploads/2023/03/CREA_Trend-Asia_EN_Ambiguities-versus-Ambition.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20210919060330/https://newssetup.kontan.co.id/news/proyek-pltu-bakal-disetop-mulai-2025-energi-terbarukan-digenjot?page=all. Archived from the original on 19 September 2021. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20211021081234/https://web.pln.co.id/statics/uploads/2021/10/ruptl-2021-2030.pdf. Archived from the original (PDF) on 21 October 2021. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 (PDF) https://web.archive.org/web/20220119142241/https://gatrik.esdm.go.id/assets/uploads/download_index/files/3fa53-ruptl-pln-2018-2027.pdf. Archived from the original (PDF) on 19 January 2022. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20190714115246/https://www.esdm.go.id/assets/media/content/content-ruptl-pt-pln-2019-2028.pdf. Archived from the original (PDF) on 14 July 2019. {{cite web}}: Missing or empty |title= (help)
  7. "Executive Summary: Electricity Supply Business Plan PT PLN (Persero) 2015-2024"
  8. "Daftar Peminat IPP PLTU Mulut Tambang," Satuan Pengadan IPP, September 2015
  9. “Rencana Usaha Penyediaan Tenaga Listrik, PT PLN (Persero), 2016-2025,” Kementerian Energi Dan Sumber Daya Mineral, June 2016, table 6.7
  10. "PLN Holds Tender for Two Non-Fossil Fuel Power Plants," Katadata, Aug 31, 2016
  11. "Request for expression of interest for partnership of cfspp kalbar-2," Indonesia Power, Aug 31, 2017
  12. Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2017-2026, PT PLN Persero, p. VI-56
  13. Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) 2019-2028, PT PLN Persero, p. V-52
  14. Bintang Mas jadi lokasi pembangunan PLTU Kalbar II, Kalbar, Apr. 7, 2019
  15. Jadwal operasional pembangkit terganggu wabah corona, ini tanggapan PLN, Kontan, Mar. 8, 2020
  16. https://newssetup.kontan.co.id/news/proyek-pltu-bakal-disetop-mulai-2025-energi-terbarukan-digenjot?page=all Proyek PLTU bakal disetop mulai 2025, energi terbarukan digenjot], Kontan, June 12, 2021

Additional data

To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Coal Plant Tracker and the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.