Kaltasy-Samara Oil Pipeline

From Global Energy Monitor
Part of the
Global Oil Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Kaltasy-Samara Oil Pipeline, also known as Kaltasy-Kuibyshev (Russian: Нефтепровод Калтасы - Куйбышев) is an operating oil pipeline in Russia.[1]

Location

The pipeline starts in Aznakayevsky District, Republic of Tatarstan, Russia and runs to Samara, Samara Oblast, Russia.[1]

Loading map...

Project details

  • Operator: Transneft - Prikamye[1]
  • Owner: Transneft
  • Parent company: Transneft
  • Capacity: 18.8 mtpa[2]
  • Length:
  • Diameter: 720 mm[3], 820 mm[4]
  • Status: Operating[5]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Based on the reconstruction of the segment document, the length of the pipeline is assumed to be 864.6 km.[2]

Articles and resources

References

  1. 1.0 1.1 1.2 "Energy Base," Accessed August 12, 2020
  2. 2.0 2.1 "Замена участка МН Калтасы - Куйбышев, Ду-700 253 км на переходе через а/д, реконструкция. Том 1" (PDF). 2018. Retrieved 2023-01-25.{{cite web}}: CS1 maint: url-status (link)
  3. "ПРОГРАММА КОМПЛЕКСНОГО РАЗВИТИЯ ТРАНСПОРТНОЙ ИНФРАСТРУКТУРЫ ГОРОДСКОГО ОКРУГА КИНЕЛЬ САМАРСКОЙ ОБЛАСТИ на 2016 - 2034 гг" (PDF). Retrieved 2023-01-25.{{cite web}}: CS1 maint: url-status (link)
  4. "ПРОЕКТ планировки территории и проект межевания территории линейного объекта: МН Альметьевск – Куйбышев 1, участок Альметьевск – Самара 1, 98,81-99,17 км, 101,37-103,16 км, 105,12-106,29 км, 110,77-112,77 км,119,18-122,37 км, 145,37-146,97 км, 163,23-164,77 км, Ду-800 мм" (PDF). sergievsk.ru. Retrieved 2023-01-25. {{cite web}}: line feed character in |title= at position 38 (help)CS1 maint: url-status (link)
  5. "АО «Транснефть – Прикамье» запустило лабораторию химического анализа НПС-3 в Татарстане". Новости Татарстана и Казани - Татар-информ (in русский). Retrieved 2023-01-25.