Kambarata Complex
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Kambarata Complex is a complex of hydroelectric power plants with varying statuses, some of which are currently operating, in Kyrgyzstan.
The complex consists of the following projects:
Complex Details
Table 1: Project-level details for Kambarata Complex
Project name | Status | Commissioning year | Nameplate capacity | Technology type | Owner |
---|---|---|---|---|---|
Kambarata-1 hydroelectric plant | construction[1] | 2034 (planned)[1] | 1860 MW[1] | Conventional storage[1] | Power Stations JSC (Elektricheskiye Stantsii) (ОАО «Электрические станции»)[2] |
Kambarata-2 hydroelectric plant | operating, pre-construction[3][4] | , 2010[4] | 360 MW[4] | Conventional storage, Conventional storage[4] | Power Stations JSC (Elektricheskiye Stantsii) (ОАО «Электрические станции»), Power Stations JSC (Elektricheskiye Stantsii) (ОАО «Электрические станции»)[4] |
Location
Table 2: Location details for Kambarata Complex
Project name | Location | River | Coordinates (WGS 84) |
---|---|---|---|
Kambarata-1 hydroelectric plant | Toktogul District, Jalal-Abad Region, Kyrgyzstan[5] | Naryn River[5] | 41.7742, 73.4367 (exact)[5] |
Kambarata-2 hydroelectric plant | Toktogul District, Jalal-Abad Region, Kyrgyzstan[5] | Naryn River, Naryn River[5] | 41.7761, 73.3255 (exact)[5] |
The map below shows the exact locations of the projects in the complex:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20220617161003/https://total.kz/ru/news/tehno/stroitelstvo_ges_kambarata1_startovalo_v_kirgizstane_date_2022_06_08_13_04_10. Archived from the original on 17 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220907222220/https://kaktus.media/doc/406427_kyrgyzstan_nameren_stroit_ges_kambar_ata_1_samostoiatelno_intervu.html. Archived from the original on 07 September 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://www.hydropower-dams.com/news/kyrgyzstan-seeks-bids-to-install-second-unit-of-kambarata-hpp-2/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20220907220146/http://www.energo-es.kg/ru/o-kompanii/filialy/kambaratinskaya-ges-2/. Archived from the original on 07 September 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20230303103614/https://www.energo-es.kg/ru/o-kompanii/karta-deystvuyushchikh-i-perspektivnykh-ges-i-tes/. Archived from the original on 03 March 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)