Kaminokuni No.2 wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Kaminokuni wind
Kaminokuni No.2 wind farm (上ノ国第二*2, 上ノ国第二2) is a wind farm under construction in Kaminokuni, Hiyama, Hokkadio Prefecture, Japan.
Project Details
Table 1: Phase-level project details for Kaminokuni No.2 wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|
Construction[1] | 2023 (planned)[2] | 42 MW[2] | Onshore[2] | Electric Power Development CO LTD (J-POWER) [100%] (電源開発株式会社)[2] |
Location
Table 2: Phase-level location details for Kaminokuni No.2 wind farm
Location | Coordinates (WGS 84) |
---|---|
Kaminokuni, Hiyama, Hokkadio Prefecture, Japan[3] | 41.8014, 140.1209 (approximate)[3] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20240125184849/https://www.jpower.co.jp/english/news_release/pdf/news210928_2e.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 (PDF) https://web.archive.org/web/20240125184021/https://www.jpower.co.jp/ir/pdf/rep2022/22_31.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20240131183901/https://www.jpower.co.jp/english/news_release/pdf/news190627_2.pdf. Archived from the original (PDF) on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)