Kampung Sungai Akar solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Kampong 30 MW solar power project, Sg Akar solar farm project, Kg Sungai Akar solar farm, Kampung Belimbing Solar, Kampung Belimbing Solar Pv

Kampung Sungai Akar solar farm is a solar photovoltaic (PV) farm in pre-construction in Kampong Sungai Akar, Brunei-Muara, Brunei.

Project Details

Table 1: Phase-level project details for Kampung Sungai Akar solar farm

Status Commissioning year Nameplate capacity Technology
Pre-construction[1] 2025 (planned)[1] 30 MWac[2] PV[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Kampung Sungai Akar solar farm

Location Coordinates (WGS 84)
Kampong Sungai Akar, Brunei-Muara, Brunei[2] 4.9378, 114.9817 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://borneobulletin.com.bn/new-solar-plant-operational-by-2025/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20220124193723/http://www.mfa.gov.bn/Cambodia-PhnomPenh/PublishingImages/SitePages/Home/RFI%20Information.pdf. Archived from the original (PDF) on 24 January 2022. {{cite web}}: Missing or empty |title= (help)
  3. (PDF) http://www.energy.gov.bn/TendersandQuotations/220131%20RFP%20Advert.pdf. {{cite web}}: Missing or empty |title= (help)