Kaprun Limberg II hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Kaprun Limberg II hydroelectric plant is an operating hydroelectric power plant in Bezirk Zell am See, Salzburg, Austria.
Project Details
Table 1: Project details for Kaprun Limberg II hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Operating[1] | 2011[2] | 480 MW[1] | 2[3] | Pumped storage[3] | Verbund Hydro Power GMBH[3] | VERBUND Hydro Power GmbH[3] |
Location
Table 2: Location details for Kaprun Limberg II hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Bezirk Zell am See, Salzburg, Austria[3] | Salzach River, Kapruner Ache River[3] | 47.1971, 12.7193 (exact)[3] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 "ENTSO-E Transparency Platform, Installed Capacity Per Production Unit". European Network of Transmission System Operators for Electricity. 2022. Retrieved April 1, 2022.
- ↑ https://web.archive.org/web/20220616182801/https://www.verbund.com/en-de/about-verbund/news-press/press-releases/2021/09/17/limberg3-baustart. Archived from the original on 16 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 https://web.archive.org/web/20220818074316/https://www.verbund.com/en-de/about-verbund/power-plants/our-power-plants/kaprun-oberstufe-limberg-2. Archived from the original on 18 August 2022.
{{cite web}}
: Missing or empty|title=
(help)