Karadaghi-Tbilisi Gas Pipeline
Karadaghi-Tbilisi Gas Pipeline, also known as Karadag-Akstafa-Tbilisi section of the Karadag-Akstafa-Tbilisi-Yerevan gas pipeline is an operating gas pipeline in Georgia. It is a part of the Azerbaijan Border-Center Group of the East-West Gas Pipeline System.[1]
Location
The pipeline runs from Azeri-Georgian border to Tbilisi, Georgia.[1]
Project details
- Operator: Georgian Gas Transportation Company[1]
- Owner: Georgian Oil and Gas Corporation[1]
- Parent company: Georgian Oil and Gas Corporation[1]
- Capacity: 4 mill.Sm3/day[2]
- Length: 46 km[1]
- Diameter: 500 mm, 800mm[1]
- Status: Operating[1]
- Start year:
- Cost:
- Financing:
- Associated infrastructure: North Caucasus Transcaucasia Pipeline
Background
The Georgian section (D=500/800 mm, L=46 km, P0=55 bar) of Karadaghi-Tbilisi Gas Pipeline consists of two parallel lines. Its construction started in 1959. South Georgia Gas Pipeline branch is connected to Karadaghi-Tbilisi Gas Pipeline that supplies gas to Kvemo Kartli and Samtskhe-Javakheti. Currently 500 mm pipeline’s 17 km length section up to Gardabani and 800 mm pipeline’s 24 km length section up to Rustavi are in operation, which continue with 700 mm section up to Vladikavkaz-Tbilisi pipeline connection.
In 2017, construction project for Azerbaijan border-Gardabani new 700-mm section was completed. It provides uninterrupted supply of Azerbaijani (SOCAR owned) gas to the market.[1]
Articles and resources
References
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "Ten-Year Development Plan for Georgian Gas Transmission Network 2019-2028" (PDF). gogc.ge. 2018. Retrieved 2022-08-16.
{{cite web}}
: line feed character in|title=
at position 30 (help)CS1 maint: url-status (link) - ↑ "Премьер: Грузия начала получать первый газ с азербайджанского месторождения "Шах-Дениз"". Trend.Az (in русский). 2007-01-17. Retrieved 2022-08-17.