Karavasta solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Karavasta solar farm is an operating solar photovoltaic (PV) farm in Fier County, Southern Albania, Albania.
Project Details
Table 1: Phase-level project details for Karavasta solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2023[1] | 140 MWp/dc[2] | PV[3] | Voltalia SA [100%][4] | Voltalia SA[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Karavasta solar farm
Location | Coordinates (WGS 84) |
---|---|
Fier County, Southern Albania, Albania[2] | 40.8491, 19.4535 (exact)[2] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.pv-tech.org/voltalia-commissions-140mw-pv-project-in-albania/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20240201200105/https://karavastasolar.com/comingsoon/images/ScopingReport_EN.pdf. Archived from the original (PDF) on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220810150211/https://www.pv-magazine.com/press-releases/in-albania-voltalia-launches-the-construction-of-the-karavasta-project-the-largest-solar-power-plant-in-the-western-balkans/. Archived from the original on 10 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240206181840/https://www.voltalia.com/case-study/karavasta-solar. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)