Karmanovskaya GRES power plant

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Karmanovskaya GRES power plant (Кармановская ГРЭС) is an operating power station of at least 1856-megawatts (MW) in Bashkortostan, Neftekamsk, Republic of Bashkortostan, Russia.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Karmanovskaya GRES power plant Bashkortostan, Neftekamsk, Republic of Bashkortostan, Russia 56.2486, 54.5882 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 56.2486, 54.5882

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 operating[3][4][5][6] fossil gas - natural gas, fossil liquids - heavy fuel oil[5][7] 315[3][5][8] steam turbine[2] 1968[5][7]
Unit 2 operating[4][9][5][6] fossil gas - natural gas, fossil liquids - heavy fuel oil[5][7] 300[8][5] steam turbine[2] 1969[5][7]
Unit 3 operating[3][10][4][5][11] fossil gas - natural gas, fossil liquids - heavy fuel oil[5][7] 316[8][10][5] steam turbine[2] 1970[5][7]
Unit 4 operating[3][4][5] fossil gas - natural gas, fossil liquids - heavy fuel oil[5][7] 300[5] steam turbine[2] 1971[5][7]
Unit 5 operating[3][4][5] fossil gas - natural gas, fossil liquids - heavy fuel oil[5][7] 300[5] steam turbine[2] 1972[5][7]
Unit 6 operating[3][4][5] fossil gas - natural gas, fossil liquids - heavy fuel oil[5][7] 325[3][5] steam turbine[2] 1973[5][7]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Bashkir Generation Company LLC (BGC) [100.0%]
Unit 2 Bashkir Generation Company LLC (BGC) [100.0%]
Unit 3 Bashkir Generation Company LLC (BGC) [100.0%]
Unit 4 Bashkir Generation Company LLC (BGC) [100.0%]
Unit 5 Bashkir Generation Company LLC (BGC) [100.0%]
Unit 6 Bashkir Generation Company LLC (BGC) [100.0%]

Background

Unit 3 has been temporarily shut down for modernization works till 2023. After modernization, the unit's capacity will increase to 316 MW.[12][13] The upgraded unit was launched in 2022.[14]

The Russia's Ministry of Energy 2023-2028 energy program issued in Febryaruary 2023 mentions modernization of units 2 and 3 to increase their installed capacity to 330 MW. The projects are expected to be completed in 2025 and 2027, accordingly.[14]

In July 2023, it was reported that Bashkir Generating Company was intending to invest 4.7 billion rubles in the modernization of Unit 2 as the unit had reached the end of its operational life and required renovation. The plan includes replacement of the main turbine components. Following the modernization, the unit's capacity will increase by 30 MW. The company began development of the project documentation, and contracts for equipment supply have been concluded.[15]

Articles and Resources

References

  1. https://web.archive.org/web/20211201210310/https://bgkrb.ru/eng/. Archived from the original on 01 December 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20220401221644/https://ru.wikipedia.org/wiki/%D0%9A%D0%B0%D1%80%D0%BC%D0%B0%D0%BD%D0%BE%D0%B2%D1%81%D0%BA%D0%B0%D1%8F_%D0%93%D0%A0%D0%AD%D0%A1. Archived from the original on 01 April 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 (PDF) https://web.archive.org/web/20230313034358/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/43_Respublika_Bashkortostan_fin.pdf. Archived from the original (PDF) on 13 March 2023. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20210830235945/https://www.wilsoncenter.org/project/karmanovskaya-tpp. Archived from the original on 30 August 2021. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 5.14 5.15 5.16 5.17 5.18 5.19 5.20 5.21 5.22 5.23 https://web.archive.org/web/20211201210745/https://bgkrb.ru/activities/business/138.pl. Archived from the original on 01 December 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20230727121055/https://www.so-ups.ru/odu-ural/news/odu-ural-news-view/news/21549/. Archived from the original on 27 July 2023. {{cite web}}: Missing or empty |title= (help)
  7. 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 https://web.archive.org/web/20220629162358/https://www.so-ups.ru/odu-ural/odu-ural-zone/krupneishie-obekty-ehlektrogeneracii-oehs-urala/karmanovskaja-grehs/. Archived from the original on 29 June 2022. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://web.archive.org/web/20221004193515/http://irao-engineering.ru/ru/projects/karmanovskaya-gres-/. Archived from the original on 04 October 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. https://web.archive.org/web/20230717081150/https://ufa.rbc.ru/ufa/13/07/2023/64b03aed9a79475e1c32207c/. Archived from the original on 17 July 2023. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20221130063319/https://utv.ru/material/my-pobyvali-na-samoj-moshnoj-gres-v-bashkirii-odin-iz-eyo-energoblokov-trebuet-modernizacii/. Archived from the original on 30 November 2022. {{cite web}}: Missing or empty |title= (help)
  11. https://energybase.ru/news/companies/second-stage-of-karmanovskaya-gres-power-unit-no-3-modernization-has-begun-2022-01-12. {{cite web}}: Missing or empty |title= (help)
  12. "Мы побывали на самой мощной ГРЭС в Башкирии. Один из её энергоблоков требует модернизации - UTV". UTV. Retrieved 2022-11-07.
  13. "Начался второй этап модернизации энергоблока № 3 Кармановской ГРЭС". Energybase.ru. Jan 12, 2022. Retrieved Nov 11, 2022.
  14. 14.0 14.1 "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ РЕСПУБЛИКА БАШКОРТОСТАН" (PDF). SO UPS of Russia. February 28, 2023. Retrieved November 30, 2023.{{cite web}}: CS1 maint: url-status (link)
  15. "БГК хочет вложить ₽4,7 млрд в модернизацию энергоблока Кармановской ГРЭС Подробнее на РБК: https://ufa.rbc.ru/ufa/13/07/2023/64b03aed9a79475e1c32207c?from=copy". ufa.rbc.ru. July 13, 2023. Retrieved November 30, 2023. {{cite web}}: External link in |title= (help); line feed character in |title= at position 73 (help)CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.