Kasar Ve Dual Tekstil solar project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Kasar Ve Dual Tekstil solar project is an operating solar photovoltaic (PV) farm in Tekirdag, Ergene, Türkiye.

Project Details

Table 1: Phase-level project details for Kasar Ve Dual Tekstil solar project

Status Nameplate capacity Technology Operator
Operating[1] 10.5 MW[1] PV[1] Kasar Ve Dual Tekstil Sanayii Anonim Sirketi[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Kasar Ve Dual Tekstil solar project

Location Coordinates (WGS 84)
Tekirdag, Ergene, Türkiye[1] 40.9913, 27.3676 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20210927232006/http://lisans.epdk.org.tr/epvys-web/faces/pages/lisans/elektrikUretim/elektrikUretimOzetSorgula.xhtml. Archived from the original on 27 September 2021. {{cite web}}: Missing or empty |title= (help)