Katkona Coal Mine is an operating coal mine in Katkona, Korea, Chhattisgarh, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Katkona Coal Mine | Katkona, Korea, Chhattisgarh, India | 23.359829, 82.680745 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
1[1] | 0.25[2] | 2022[2] | Underground | – | 10.65 | 300* | 854* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
14.45 | – | 95.63 | Jhilimili | Subbituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
South Eastern Coalfields Ltd | Coal India Ltd [100.0%] | India |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background on Mine
The Katkona Underground Coal Mine has a designed capacity of 0.36 MTPA on a mining lease area of 1130.929 ha. It is operated by South Eastern Coalfields Limited.
The project received its environment clearance for a capacity expansion from 0.225 MTPA to 0.36 MTPA on 20 June 2006.[3]
However, the EC lapsed and SECL had to apply for the revalidation of the environment clearance granted to the project on 20 June 2006. In 40th EAC (thermal and coal mining projects), MoEF&CC India, meeting held on 26 October 2018, the company was asked to conduct EIA/EMP study and public hearing once again.[4]
Meanwhile, the Katkona 3&4 exhausted its capacity and hence has been closed.[5] The mine can now start only after regrant of the EC from the MoEF&CC India.
Expansion Details
- Status:
- Size of Expansion:
- Permits and Applications:
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://d3u7ubx0okog7j.cloudfront.net/documents/SECL_Annual_Report_2022-23.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20240129173121/https://coal.nic.in/sites/default/files/2023-05/23-05-2023.pdf. Archived from the original (PDF) on 29 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Environment Clearance for Expansion of Katkona Underground Coal Mine Project, MoEF&CC India, 20 June 2006
- ↑ Meeting minutes of the EAC MoEF&CC India, 26 October 2018
- ↑ Minister of coal in Parliament, 8 August 2018