Kazimierz Biskupi wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Kazimierz Biskupi wind farm is a wind farm under construction in Poland.
Project Details
Table 1: Phase-level project details for Kazimierz Biskupi wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|
Construction[1] | 2023 (planned)[2] | 17.5 MW[2] | Onshore[2] | ZE PAK SA; Grupa Polsat Plus[3][1] |
Location
Table 2: Phase-level location details for Kazimierz Biskupi wind farm
Location | Coordinates (WGS 84) |
---|---|
Poland | 52.3095, 18.174 (approximate)[2] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.press.pl/magazyn-press/artykul/71524grupa-polsat-plus.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://ri.zepak.com.pl/en/reports/current-reports/1765-conclusion-of-a-loan-agreement-by-farma-wiatrowa-kazimierz-biskupi-sp-z-oo-with-bank-gospodarstwa-krajowego.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://grupapolsatplus.pl/sites/default/files/documents/2021/polsat_plus_group_ir_newsletter_33_2022.pdf.
{{cite web}}
: Missing or empty|title=
(help)