Khabarovsk-4 power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Khabarovsk-4 power station (Хабаровская ТЭЦ-4, Южная ТЭЦ) is a power station under construction in Khabarovsk, Khabarovsk region, Russia. It is also known as Khabarovsk CHP-4, South Substation.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Khabarovsk-4 power station Khabarovsk, Khabarovsk region, Russia 48.411112, 135.1139403 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 1, 2: 48.411112, 135.1139403

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Construction[3][4][5][6][7] fossil gas: natural gas, fossil liquids: diesel[8][5] 205[8][9] combined cycle[8][9] yes[8][9] 2027 (planned)[8][10][11]
2 Construction[3][4][5][6][7] fossil gas: natural gas, fossil liquids: diesel[8][5] 205[8][9] combined cycle[8][9] yes[8][9] 2027 (planned)[8][10][11]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
1 Far Eastern Generating Company[4] Far Eastern Generating Company JSC [100%][8][12] RusHydro PJSC [100.0%]
2 Far Eastern Generating Company[4] Far Eastern Generating Company JSC [100%][8][12] RusHydro PJSC [100.0%]

Background

In September 2021, it was reported that the design of the Khabarovsk-4 power station had been completed, a land plot had been formalized on the territory adjacent to the Khabarovsk CHPP-1, and construction was scheduled to begin in 2021.[13] The technical part of the project and the results of engineering surveys received a positive conclusion from the Glavgosexpertiza of Russia.[14] The work was planned to be completed in two stages - until 2024 and until 2025.[13][15] Construction was expected to be carried out by RusHydro.[15]

Construction of Khabarovsk-4 power plant started in February 2022.[14][16] In July 2022 it was reported that the company intended to use equipment manufactured in Russia for this station.[17] In August- September 2022 the construction was ongoing.[18][19] According to a report by East Russia, the company experienced issues with main equipment that was part of the initial design and had to redesign the power units. This was expected to delay commissioning to 2027.[20]

In October 2023, the first equipment of the power station was commissioned. Until the end of the construction, the newly installed equipment will be utilized by the operating Khabarovsk-1 power station. The construction is expected to complete in 2027.[21]

According to an order issued by the Russian government in December 2023, the Kahabrovsk-4 power station will become operational by 1, 2027.[22] As of April 2024, equipment for chemical water treatment is being installed on the site, a pumping water supply system is being constructed, and provisions are being made for the storage of backup fuel.[23]

As of December 2024, construction of the Khabarovsk CHP-4 power station is ongoing. This investment project, managed by RusHydro and implemented by UK HydroOGK, will be operated by Far Eastern Generating Company. By the end of 2024, the project aims to complete the gas and backup fuel infrastructure, along with commissioning two out of six water-heating boilers in the heat supply complex. These boilers will ensure a guaranteed thermal capacity of at least 360 Gcal/h, contributing to the facility's total capacity of 1080 Gcal/h. Additionally, work on the auxiliary building is also scheduled for completion. The power station is planned to be commissioned in 2027.[24]

The working name "CHP-4" will be replaced with "Southern Substation" upon commissioning. The project has undergone full import substitution due to the pressure of Western sanctions, ensuring that all components and equipment are sourced exclusively from Russian manufacturers. CHP-4 will operate solely on gas. This shift eliminates coal dust pollution, benefiting residents of the Industrial District. Diesel fuel will serve as an emergency backup to ensure reliability during potential technical issues.[25]

Articles and Resources

References

  1. https://web.archive.org/web/20220427131915/https://www.dvnovosti.ru/khab/2018/01/11/77202/. Archived from the original on 2022-04-27. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://web.archive.org/web/20210909162036/http://www.rushydro.ru/upload/iblock/7f0/Protokol-Hab.TETs4.pdf. Archived from the original (PDF) on 2021-09-09. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://habarovsk.bezformata.com/listnews/metanovie-zapravki-obsudili-v-habarovske/130236696/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://rushydro.ru/press/news/1511202491128/?utm_source=google.com&utm_medium=organic&utm_campaign=google.com&utm_referrer=google.com. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://vestidv.ru/news/2024/11/15/90275. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20231026010125/https://tass.ru/ekonomika/19033869. Archived from the original on 2023-10-26. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20230414220318/https://todaykhv.ru/news/economics-and-business/63793/. Archived from the original on 2023-04-14. {{cite web}}: Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 (PDF) https://web.archive.org/web/20230313041747/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/72_KHabarovskii_krai_fin.pdf. Archived from the original (PDF) on 2023-03-13. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 (PDF) https://minenergo.gov.ru/upload/iblock/202/document_226117.pdf. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 (PDF) https://minenergo.gov.ru/upload/iblock/808/Prikaz-ME-ot-29.11.2024-_2328-ob-utverzhdenii-SiPR-EES-na-2025_2030-PUBLIKATSIYA.pdf. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 https://web.archive.org/web/20240424224232/https://www.garant.ru/products/ipo/prime/doc/408223511/. Archived from the original on 2024-04-24. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 https://peretok.ru/news/engineering/26106/. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 "Новая экологически чистая ТЭЦ начнет работать в Хабаровске уже в 2024 году". Official Website of the Government of Khabarovsk Krai. Sep 13, 2021. Retrieved Jan 4, 2022.{{cite web}}: CS1 maint: url-status (link)
  14. 14.0 14.1 "РусГидро ведёт строительство Хабаровской ТЭЦ-4". 27r.ru. Feb 1, 2022. Retrieved Oct 26, 2022.
  15. 15.0 15.1 "Экологически чистая ТЭЦ заработает в Хабаровске в 2024 году". RIA Novosti. Sep 13, 2021. Retrieved Jan 4, 2022.{{cite web}}: CS1 maint: url-status (link)
  16. "Строительство ТЭЦ-4 стартовало в Хабаровске". Khabara.ru. Feb 1, 2022. Retrieved Apr 18, 2022.
  17. "Новую ТЭЦ-4 построят с российским оборудованием". dvnovosti.ru. Jul 27, 2022. Retrieved Oct 26, 2022.
  18. "Ход ремонта на ТЭЦ-3 проверили в Хабаровске". Gubernia.com. Aug 5, 2022. Retrieved Oct 26, 2022.
  19. "В Хабаровском крае жилищное строительство набирает обороты". todaykhv.ru. Sep 15, 2022. Retrieved Oct 26, 2022.
  20. "Бюллетень EastRussia: электроэнергетика Дальнего Востока". Eastrussia.ru. Aug 26, 2022. Archived from the original on Oct 26, 2022. Retrieved Oct 26, 2022.
  21. "В Хабаровске ввели в эксплуатацию первые объекты строящейся ТЭЦ-4". TASS. October 17, 2023. Retrieved November 15, 2023.{{cite web}}: CS1 maint: url-status (link)
  22. "Распоряжение Правительства РФ от 28 декабря 2023 г. N 4013-р Об утверждении перечня генерирующих объектов тепловых электростанций, подлежащих модернизации (реконструкции) или строительству в неценовых зонах оптового рынка электрической энергии и мощности". December 28, 2023. Retrieved April 19, 2024.{{cite web}}: CS1 maint: url-status (link)
  23. "Работу ТЭЦ-4, ТМ-35 и метановые заправки обсудили в Хабаровске". habarovsk.bezformata.com. April 12, 2024. Retrieved April 19, 2024.{{cite web}}: CS1 maint: url-status (link)
  24. "Второй этап строительства Хабаровской ТЭЦ-4 завершат до конца 2024 года". RusHydro. November 15, 2024. Retrieved December 10, 2024.{{cite web}}: CS1 maint: url-status (link)
  25. "Будет экологичной и получит новое название: строительство ТЭЦ-4 в Хабаровске завершится в 2027 году". vestidv.ru. November 15, 2024. Retrieved December 10, 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.