Khafji Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Khafji Gas Pipeline, خط غاز الخفجي, is an operating gas pipeline running from Khafji field to Al Zour, Kuwait.[1][2]

Location

The pipeline runs from Khafji field to Al Zour, Kuwait[1]

Loading map...

Project details

Khafji Gas Pipeline 1

  • Operator: Kuwait Gulf Oil Company (KGOC)[1]
  • Owner: Kuwait Petroleum Corporation[3]
  • Parent company: Kuwait Petroleum Corporation[3]
  • Capacity: 40 MMcf/d[4]
  • Length: 10 km[5]
  • Diameter: 12in[5]
  • Status: Operating[5]
  • Start year: 2021[5]
  • Cost:
  • Financing:
  • Associated infrastructure:

Khafji Gas Pipeline 2- A Onshore

  • Operator: Kuwait Gulf Oil Company (KGOC)[1]
  • Owner: Kuwait Petroleum Corporation[3]
  • Parent company: Kuwait Petroleum Corporation[3]
  • Capacity: 40 MMcf/d[4]
  • Diameter: 12in[5]
  • Status: Operating[5]
  • Start year: 2023[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Khafji Gas Pipeline 2- B Offshore

  • Operator: Kuwait Gulf Oil Company (KGOC)[1]
  • Owner: Kuwait Petroleum Corporation[3]
  • Parent company: Kuwait Petroleum Corporation[3]
  • Capacity: 40 MMcf/d[4]
  • Length: 47km[5]
  • Diameter: 12in[5]
  • Status: Operating[5]
  • Start year: 2023[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Khafji Gas Pipeline 2- C Onshore

  • Operator: Kuwait Gulf Oil Company (KGOC)[1]
  • Owner: Kuwait Petroleum Corporation[3]
  • Parent company: Kuwait Petroleum Corporation[3]
  • Capacity: 40 MMcf/d[4]
  • Length: 58km[5]
  • Diameter: 12in[5]
  • Status: Operating[5]
  • Start year: 2023[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Kuwait Announces Khafhi Gas Pipeline Completion". MEES. Retrieved 2023-09-07.
  2. "خط غاز الخفجي إلى الكويت يدخل الخدمة رسميا بطاقة 11 مليون قدم مكعبة من الغاز و29 مليون قدم من الغاز الحمضي يوميا". https://www.alanba.com.kw (in العربية). Retrieved 2023-09-07. {{cite news}}: External link in |work= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://www.kgoc.com/. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 "الانتهاء من المرحلة الثانية لخط نقل غاز الخفجي إلى الكويت". https://www.alanba.com.kw (in العربية). Retrieved 2023-09-07. {{cite news}}: External link in |work= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 (PDF) https://www.kpc.com.kw/ar/press/KPCPublications/AnnualReports/Annual%202021-2022%20Arabic.pdf. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)