Khaperkheda power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Khaperkheda power station is an operating power station of at least 1340-megawatts (MW) in Chandkapur, Savner, Nagpur, Maharashtra, India. It is also known as Khaperkheda-3 power station Unit 1 (Unit 5 (Khaperkheda-3 Unit 1)).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Khaperkheda power station Chandkapur, Savner, Nagpur, Maharashtra, India 21.2818, 79.116 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4, Unit 5 (Khaperkheda-3 Unit 1): 21.2818, 79.116

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Unit 1 operating coal: bituminous 210 subcritical 1989
Unit 2 operating coal: bituminous 210 subcritical 1990
Unit 3 operating coal: bituminous 210 subcritical 2000
Unit 4 operating coal: bituminous 210 subcritical 2001
Unit 5 (Khaperkheda-3 Unit 1) operating coal: bituminous 500 subcritical 2011

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]
Unit 2 Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]
Unit 3 Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]
Unit 4 Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]
Unit 5 (Khaperkheda-3 Unit 1) Maharashtra State Power Generation Co Ltd [100%] MSEB Holding Co Ltd [100.0%]

Financing

Source of financing:

Background

Khaperkheda power station has five units:[1]

  • Unit 1 - 210 MW - 1989
  • Unit 2 - 210 MW - 1990
  • Unit 3 - 210 MW - 2000
  • Unit 4 - 210 MW - 2001
  • Unit 5 - 500 MW - 2011

The plant is owned by the Maharashtra government owned company Maharashtra State Power Generation Company (MSPGCL).

According to the India Central Electricity Authority, Unit 5 was "commissioned successfully (Full load)" in August, 2011.[2] Unit 5 is also referred to as Khaperkheda-3 Unit 1.

Articles and Resources

References

  1. Maharashtra State Power Generation Company, "Installed Capacity", Maharashtra State Power Generation Company website, accessed November 2011.
  2. "India Central Electricity Authority Monthly Report," India Central Electricity Authority, August 2011.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.