Kharbeyskoye Field Condensate Pipeline

From Global Energy Monitor
Part of the
Global Oil Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Kharbeyskoye Field Condensate Pipeline (Russian: конденсатопровод Харбейского месторождения) is an operating condensate pipeline in Russia.[1]


Location

The pipeline runs from the Kharbeyskoye Oil and Gas Field, Tazovsky District, to Tibeysale, Tazovsky District, Yamalo-Nenets Autonomous District, Russia.[1]

Loading map...

Project details

Background

The pipeline is used to transport unstable gas condensate from the Kharbeyskoye Oil and Gas Field to the Severo-Russkoye Oil and Gas Field from where the condensate is transported via the North Russkoye Condensate Pipeline and the Yurkharovskoye-Purovsk Condensate Pipeline to the Purovsky Gas Processing Plant. The construction of the pipeline began in 2020. NOVATEK started production at the field in 2021. Thus, the pipeline is presumed to be operating.[1][4][5][6]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Стройка на Харбейском месторождении". ВКонтакте. April 20, 2020. Retrieved February 26, 2024.{{cite web}}: CS1 maint: url-status (link)
  2. "Novatek starts production at Kharbeyskoye field". www.offshore-energy.biz. November 19, 2021. Retrieved February 26, 2024.{{cite web}}: CS1 maint: url-status (link)
  3. "About company". NOVATEK. 2024. Retrieved February 23, 2024.{{cite web}}: CS1 maint: url-status (link)
  4. 4.0 4.1 4.2 "Kharbeyskoye field". neftegazru.com. January 14, 2022. Retrieved February 26, 2024.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 "Novatek 2022 Annual Report" (PDF). Novatek. April 21, 2023. Retrieved February 26, 2024.{{cite web}}: CS1 maint: url-status (link)
  6. "Novatek 2021 Annual Report" (PDF). NOVATEK. April 21, 2022. Retrieved February 26, 2024.{{cite web}}: CS1 maint: url-status (link)