Khor Al-Amaya Oil Pipelines
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Khor Al-Amaya Oil Pipelines, خطوط أنابيب خور العمية, is a series of under construction، mothballed and operating oil pipelines running from Khor Al-Amaya Terminal and within Fao Peninsula on the Iraqi Persian Gulf.[1]
Location
The pipelines runs from under construction and operating oil pipelines running from Khor Al-Amaya Terminal and within Fao Peninsula on the Iraqi Persian Gulf.[1]
Project details
Pipeline 1
- Operator: Basra Oil Company[1]
- Owner: Iraqi Ministry of Oil[1]
- Parent company: Iraqi Ministry of Oil[1]
- Capacity:
- Length: 46[2]
- Diameter: 42[2]
- Status: Operating
- Start year: 1970[3]
- Cost:
- Financing:
- Associated infrastructure:
Pipeline 2
- Operator: Basra Oil Company[1]
- Owner: Iraqi Ministry of Oil[1]
- Parent company: Iraqi Ministry of Oil[1]
- Capacity:
- Length: 46[2]
- Diameter: 32[2]
- Status: Mothballed[2]
- Start year: 1970 [3]
- Cost:
- Financing:
- Associated infrastructure:
Pipeline 3
- Operator: Basra Oil Company[1]
- Owner: Iraqi Ministry of Oil[1]
- Parent company: Iraqi Ministry of Oil[1]
- Capacity:
- Length:
- Diameter: 48[4]
- Status: Operating[4]
- Start year: 2017[4]
- Cost:
- Financing:
- Associated infrastructure:
Pipeline 4
- Operator: Basra Oil Company[1]
- Owner: Iraqi Ministry of Oil[1]
- Parent company: Iraqi Ministry of Oil[1]
- Capacity: 600,000[5]
- Length:
- Diameter:
- Status: Operating[5]
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Background
Pipeline 4 was slated to come online in 2023. There is no evidence to the contrary, so it is presumably operational as of 2023.[5]
Articles and resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 "نفط البصرة تحدد موعد دخول ميناء خور العمية الخدمة وحجم الطاقة التصديرية". وكالة الأنباء العراقية. Retrieved 2023-02-23.
- ↑ 2.0 2.1 2.2 2.3 2.4 (PDF) https://ieiti.org.iq/mediafiles/articles/doc-65-20171201120329.pdf.
{{cite web}}
: Missing or empty|title=
(help)CS1 maint: url-status (link) - ↑ 3.0 3.1 صلاح حسن بابان. "زيادة التصدير وإيقاف التهريب.. مساع عراقية لتغيير أنابيب النفط القديمة" (in العربية). Retrieved 2023-02-24.
- ↑ 4.0 4.1 4.2 "Iraq Oil Report" (PDF).
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 5.2 "Basra Oil Company: Third offshore pipeline to complete by 2023".
{{cite web}}
: CS1 maint: url-status (link)