Khor Al-Amaya Oil Pipelines

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Khor Al-Amaya Oil Pipelines, خطوط أنابيب خور العمية, is a series of under construction، mothballed and operating oil pipelines running from Khor Al-Amaya Terminal and within Fao Peninsula on the Iraqi Persian Gulf.[1]

Location

The pipelines runs from under construction and operating oil pipelines running from Khor Al-Amaya Terminal and within Fao Peninsula on the Iraqi Persian Gulf.[1]

Loading map...

Project details

Pipeline 1

  • Operator: Basra Oil Company[1]
  • Owner: Iraqi Ministry of Oil[1]
  • Parent company: Iraqi Ministry of Oil[1]
  • Capacity:
  • Diameter: 42[2]
  • Status: Operating
  • Start year: 1970[3]
  • Cost:
  • Financing:
  • Associated infrastructure:

Pipeline 2

  • Operator: Basra Oil Company[1]
  • Owner: Iraqi Ministry of Oil[1]
  • Parent company: Iraqi Ministry of Oil[1]
  • Capacity:
  • Diameter: 32[2]
  • Status: Mothballed[2]
  • Start year: 1970 [3]
  • Cost:
  • Financing:
  • Associated infrastructure:

Pipeline 3

  • Operator: Basra Oil Company[1]
  • Owner: Iraqi Ministry of Oil[1]
  • Parent company: Iraqi Ministry of Oil[1]
  • Capacity:
  • Length:
  • Diameter: 48[4]
  • Status: Operating[4]
  • Start year: 2017[4]
  • Cost:
  • Financing:
  • Associated infrastructure:

Pipeline 4

  • Operator: Basra Oil Company[1]
  • Owner: Iraqi Ministry of Oil[1]
  • Parent company: Iraqi Ministry of Oil[1]
  • Capacity: 600,000[5]
  • Length:
  • Diameter:
  • Status: Operating[5]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Pipeline 4 was slated to come online in 2023. There is no evidence to the contrary, so it is presumably operational as of 2023.[5]

Articles and resources

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 "نفط البصرة تحدد موعد دخول ميناء خور العمية الخدمة وحجم الطاقة التصديرية". وكالة الأنباء العراقية. Retrieved 2023-02-23.
  2. 2.0 2.1 2.2 2.3 2.4 (PDF) https://ieiti.org.iq/mediafiles/articles/doc-65-20171201120329.pdf. {{cite web}}: Missing or empty |title= (help)CS1 maint: url-status (link)
  3. 3.0 3.1 صلاح حسن بابان. "زيادة التصدير وإيقاف التهريب.. مساع عراقية لتغيير أنابيب النفط القديمة" (in العربية). Retrieved 2023-02-24.
  4. 4.0 4.1 4.2 "Iraq Oil Report" (PDF).{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 5.2 "Basra Oil Company: Third offshore pipeline to complete by 2023".{{cite web}}: CS1 maint: url-status (link)