Khudafarin (Khoda Afarin) hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Khudafarin (Khoda Afarin) hydroelectric plant (Худаферинская ГЭС, Xudafərin SES) is a hydroelectric power plant under construction on the border of East Zangezur, Azerbaijan and East Azerbaijan Province, Iran.

Project Details

Table 1: Project details for Khudafarin (Khoda Afarin) hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Technology type Owner
Construction[1][2] 2024[3] 102 MW[4] 2 x 51 MW[4] Conventional storage[5] JSC Azerenerji (Azərenerji ASC)[6]

Location

Table 2: Location details for Khudafarin (Khoda Afarin) hydroelectric plant

Cross-border location 1 Cross-border location 2 River Coordinates (WGS 84)
Jabrayil District, East Zangezur, Azerbaijan[7][8] دهستان منجوان شرقی, Khoda Afarin County, East Azerbaijan Province, Iran[7][9][8] Aras River[5] 39.1595, 46.9343 (exact)[8][7]

The map below shows the exact location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20220922092842/https://news.day.az/economy/1434506.html. Archived from the original on 22 September 2022. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20230323164916/https://en.wikipedia.org/wiki/Khoda_Afarin_Dam. Archived from the original on 23 March 2023. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20220921043517/http://interfax.az/view/871304. Archived from the original on 21 September 2022. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20210802193902/http://www.farab.com/en/portfolio/khodaafarin-hydro-power-plant/. Archived from the original on 02 August 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20220922100601/https://caspiannews.com/news-detail/iran-azerbaijan-resume-construction-of-joint-hydropower-plants-2021-2-24-53/. Archived from the original on 22 September 2022. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20220922095413/http://interfax.az/view/831511. Archived from the original on 22 September 2022. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 https://goo.gl/maps/8UuXHRbW3hortaDh9. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 https://web.archive.org/web/20220922101012/http://wikimapia.org/7566401/ru/%D0%A5%D1%83%D0%B4%D0%B0%D1%84%D0%B5%D1%80%D0%B8%D0%BD%D1%81%D0%BA%D0%B0%D1%8F-%D0%93%D0%AD%D0%A1. Archived from the original on 22 September 2022. {{cite web}}: Missing or empty |title= (help)
  9. https://goo.gl/maps/xUKt2vRvcrzMyaYYA. {{cite web}}: Missing or empty |title= (help)