Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project was a proposed gas pipeline in Bangladesh which is now presumed shelved. [1]
Location
The pipeline would run from Khulna to Barishal through Bagerhat, Pirojpur, and Jhalokathi [2]
Project Details
- Operator: Gas Transmission Company Limited (GTCL) [1]
- Owner: Gas Transmission Company Limited (GTCL) [1]
- Parent company: Petrobangla [1]
- Capacity:
- Length: 110 km / 68.35 miles[1]
- Diameter: 36 inches[1]
- Status: Shelved[1][3]
- Start year: 2035[1]
- Cost:
- Financing:
- Associated infrastructure:
Background
The pipeline project was expected to start in July 2031 and would be completed by June 2035.[1] The project was not listed in the 2021 Petrobangla Annual report.[3] As of August 2023, it was not mentioned in the GTCL list of future projects. [4]
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "Existing Pipeline". GTCL. Retrieved 2021-08-25.
- ↑ Annual Report 2019 (PDF). PETROBANGLA. 2020. p. 47.
- ↑ 3.0 3.1 "Annual Report 2021" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Future Projects". GTCL.
{{cite web}}
: CS1 maint: url-status (link)