Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Khulna-Bagerhat-Pirojpur-Jhalokathi-Barishal Gas Transmission Pipeline Project was a proposed gas pipeline in Bangladesh which is now presumed shelved. [1]

Location

The pipeline would run from Khulna to Barishal through Bagerhat, Pirojpur, and Jhalokathi [2]

Loading map...

Project Details

  • Operator: Gas Transmission Company Limited (GTCL) [1]
  • Owner: Gas Transmission Company Limited (GTCL) [1]
  • Parent company: Petrobangla [1]
  • Capacity:
  • Length: 110 km / 68.35 miles[1]
  • Diameter: 36 inches[1]
  • Status: Shelved[1][3]
  • Start year: 2035[1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The pipeline project was expected to start in July 2031 and would be completed by June 2035.[1] The project was not listed in the 2021 Petrobangla Annual report.[3] As of August 2023, it was not mentioned in the GTCL list of future projects. [4]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "Existing Pipeline". GTCL. Retrieved 2021-08-25.
  2. Annual Report 2019 (PDF). PETROBANGLA. 2020. p. 47.
  3. 3.0 3.1 "Annual Report 2021" (PDF). Petrobangla.{{cite web}}: CS1 maint: url-status (link)
  4. "Future Projects". GTCL.{{cite web}}: CS1 maint: url-status (link)

Related SourceWatch articles

External resources

External articles