Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Khulna-Gopalgonj-Tekerhat Gas Transmission Pipeline was a proposed gas pipeline in Bangladesh, which is now presumed shelved. [1]
Location
The pipeline would run from Khulna to Tekerhat, Bangladesh.[2]
Project Details
- Operator: Gas Transmission Company Limited (GTCL) [2]
- Owner: Gas Transmission Company Limited (GTCL) [2]
- Parent company: Petrobangla [2]
- Capacity:
- Length: 77 km[2]
- Diameter: 36 inches[2][3]
- Status: Shleved[2][1]
- Start year: 2029[2][4]
- Cost:
- Financing:
- Associated infrastructure:
Background
The project is owned by GTCL, a subsidiary of Petrobangla.[2] As of 2024, the project is not listed in GTCL's planned projects.[1][5]
Articles and resources
References
- ↑ 1.0 1.1 1.2 https://petrobangla.portal.gov.bd/sites/default/files/files/petrobangla.portal.gov.bd/annual_reports/035c1d34_7671_4477_9fc1_71659da2357f/2023-10-14-17-08-efda448681328c0e62f973d4451819ee.pdf
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 "Annual Report 2020" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Annual Report 2021" (PDF). Petrobangla.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Future Projects". GTCL.
{{cite web}}
: CS1 maint: url-status (link) - ↑ https://gtcl.portal.gov.bd/sites/default/files/files/gtcl.portal.gov.bd/monthly_report/f77ce396_ccee_46c8_8157_c0667c8ea4c1/2024-03-24-06-39-34a3686bc6eb7675953326a048feb1f8.pdf