Kilranelagh wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Kilranelagh Hill
Kilranelagh wind farm is a cancelled wind farm in Baltinglass, Wicklow, Leinster, Ireland.
Project Details
Table 1: Phase-level project details for Kilranelagh wind farm
Status | Nameplate capacity | Type | Owner |
---|---|---|---|
Cancelled[1] | 30 MW[2] | Onshore[2] | ABO Wind AG [100%][3] |
Location
Table 2: Phase-level location details for Kilranelagh wind farm
Location | Coordinates (WGS 84) |
---|---|
Baltinglass, Wicklow, Leinster, Ireland[4] | 52.9409, -6.7088 (approximate)[4] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240126141136/https://wicklownews.net/2021/03/a-sigh-of-relief-for-unique-historic-site-in-west-wicklow/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20220221150822/https://irishsolarenergy.org/wp-content/uploads/2020/07/Ireland2020.pdf. Archived from the original (PDF) on 21 February 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20211208015453/https://www.abo-wind.com/en/the-company/international/ireland/kilranelagh-wind-farm.html. Archived from the original on 08 December 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 https://web.archive.org/web/20240131220903/https://www.independent.ie/regionals/wicklow/news/permission-to-build-five-turbine-wind-farm-at-kilranelagh-refused/40231644.html. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)