Kinyerezi IV power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Kinyerezi IV power station is a shelved power station in Kinyerezi, Dar es Salaam, Tanzania.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Kinyerezi IV power station | Kinyerezi, Dar es Salaam, Tanzania | -6.863267, 39.153972 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP |
---|---|---|---|---|---|
1 | Shelved[2] | fossil gas: natural gas[3] | 330[1] | combined cycle[1] | not found |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Tanzania Electric Supply Co Ltd [100%][3] | Tanzania Electric Supply Co Ltd [100.0%] |
Background
The plant is part of the four-power-plant complex in Kinyerezi, which falls under the national electricity company. The plants are the Kinyerezi I power station, Kinyerezi II power station, Kinyerezi III power station, and Kinyerezi IV power station.
In 2012, Tanzania signed a contract with three Chinese companies to start the construction of a 542-km pipeline leading from Mtwara to the country’s capital, Dar es Salaam to transport natural gas from the Mnazi Bay gas field. The project was financed by a Chinese loan and grants from the World Bank (USD 300 million) and the African Development Bank (USD 200 million). The pipeline and processing plant were part of the Government’s program to add 10000 MW of generation capacity by 2025, up from the 1500 MW in 2015. The aim is to reduce dependency on hydropower, representing 31% of Tanzania’s power generation and whose capacity has been affected by recurring droughts hitting the country.[4]
As of July 2022, the plant is considered canceled.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20221002184813/https://tanesco.co.tz/index.php/projects/donor-funded/147-new-on-going-power-projects/file. Archived from the original on 02 October 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221204181429/https://www.tanesco.co.tz/index.php/investments/investment-report/22-power-system-master-plan-2012-update/file. Archived from the original on 04 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20210602170858/https://constructionreviewonline.com/news/tanzania/tanzania-set-to-complete-us-432m-kinyerezi-ii-power-project/. Archived from the original on 02 June 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ "Gas".
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.