Kiwaba Nzoji wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Kiwaba Nzoji wind farm is a wind farm in pre-construction in Kiwaba Nzoji, Malanje, Angola.
Project Details
Table 1: Phase-level project details for Kiwaba Nzoji wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1] | 2033 (planned)[2] | 62 MW[3] | Onshore[4] | V&V Rending SA [100%][3] |
2 | Pre-construction[1] | 2034 (planned)[2] | 42 MW[4] | Onshore[4] | V&V Rending SA [100%][4] |
Location
Table 2: Phase-level location details for Kiwaba Nzoji wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Kiwaba Nzoji, Malanje, Angola[4] | -8.9409, 16.4722 (exact)[4] |
2 | Malanje Province, Angola[4] | -8.9297, 16.4863 (exact)[4] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 (PDF) https://web.archive.org/web/20240126114227/https://www.lerenovaveis.org/contents/lerpublication/aler-relatorio-angola.pdf. Archived from the original (PDF) on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 (PDF) https://web.archive.org/web/20221013104158/http://openjicareport.jica.go.jp/pdf/12324307_01.pdf. Archived from the original (PDF) on 13 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20220113192148/https://www.minea.gv.ao/index.php/planos-de-accao-do-minea/category/230-realact?download=668%3Arelbal2020. Archived from the original on 13 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20240125154011/https://www.aler-renovaveis.org/contents/activitiesdocuments/aler-relatorio-angola_9528.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help)