Kleczew Hybrid Wind & Solar Project solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Kleczew Hybrid Wind & Solar Project solar farm is a solar photovoltaic (PV) farm in pre-construction in Konin County, Greater Poland Voivodeship, Poland.
Project Details
Table 1: Phase-level project details for Kleczew Hybrid Wind & Solar Project solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Construction[1] | 2024 (planned)[2] | 193 MWp/dc[3] | PV[3] | ORLEN Group SA [100%][2] |
2 | Pre-construction[3] | 2025 (planned)[2] | 122 MWp/dc[2] | PV[3] | ORLEN Group SA [100%][2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Kleczew Hybrid Wind & Solar Project solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Konin County, Greater Poland Voivodeship, Poland[4] | 52.3778, 18.1995 (approximate)[4] |
2 | Konin County, Greater Poland Voivodeship, Poland[4] | 52.3778, 18.1995 (approximate)[4] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240206150830/https://www.tvp.pl/. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240219014119/https://ceenergynews.com/renewables/orlen-signs-deal-for-hybrid-kleczew-solar-and-wind-farm-acquisition/. Archived from the original on 19 February 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240126033911/https://www.pv-tech.org/polands-lewandpol-group-obtains-fund-to-build-large-solar-and-wind-energy-park/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240206210359/https://cms.law/en/pol/news-information/cms-advises-lewandpol-and-e-g-on-a-hybrid-solar-wind-farm-project. Archived from the original on 06 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)