Kleczew Hybrid Wind & Solar Project solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Kleczew Hybrid Wind & Solar Project solar farm is a solar photovoltaic (PV) farm in pre-construction in Konin County, Greater Poland Voivodeship, Poland.

Project Details

Table 1: Phase-level project details for Kleczew Hybrid Wind & Solar Project solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Construction[1] 2024 (planned)[2] 193 MWp/dc[3] PV[3] ORLEN Group SA [100%][2]
2 Pre-construction[3] 2025 (planned)[2] 122 MWp/dc[2] PV[3] ORLEN Group SA [100%][2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Kleczew Hybrid Wind & Solar Project solar farm

Phase Name Location Coordinates (WGS 84)
1 Konin County, Greater Poland Voivodeship, Poland[4] 52.3778, 18.1995 (approximate)[4]
2 Konin County, Greater Poland Voivodeship, Poland[4] 52.3778, 18.1995 (approximate)[4]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240206150830/https://www.tvp.pl/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240219014119/https://ceenergynews.com/renewables/orlen-signs-deal-for-hybrid-kleczew-solar-and-wind-farm-acquisition/. Archived from the original on 19 February 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240126033911/https://www.pv-tech.org/polands-lewandpol-group-obtains-fund-to-build-large-solar-and-wind-energy-park/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20240206210359/https://cms.law/en/pol/news-information/cms-advises-lewandpol-and-e-g-on-a-hybrid-solar-wind-farm-project. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)