Kolubara G Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Kolubara G Coal Mine is an operating coal mine in Veliki Crjleni, Central Serbia, Serbia.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Kolubara G Coal Mine | Veliki Crjleni, Central Serbia, Serbia[1] | 44.4678357812436, 20.2664008823712 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating[2][3] | – | 2017[2][3] | 2026[4] |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
– | 4.4 | 2023 | Surface | Open Pit | – | 100 | #REF!* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
35[5] | – | – | Kolubara | Lignite | Thermal | Kolubara B Power Station |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Elektroprivreda Srbije Beograd AD[6] | Government of the Republic of Serbia | Serbia |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
Saleable | 0.2[7] | 4[8] | 6.1[9] | 6.5[10] | 5.2[11] | 5.7[12] | 4.4[13] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September and December supplements.
Background
The Kolubara Field G coal mine is a surface mine near Veliki Crljeni, Serbia. It is part of Kolubara Mine Complex.
Field G coal mine is located in the western part of the Kolubara coal basin and it started operating in 2017 after the completed exploitation at the Veliki Crljeni mine, as its substitute capacity.[14][15]
As per 2008 EBRD's document, Veliki Crljeni planned mining start in 2009 and should have ceased mining 2016.[16] Technical report by EPS for 2017 confirmed that Veliki Crljeni section ceased to produce in 2016 and Field G started production in 2017.[17]
As per the basin map from 2011 (see below) Veliki Crleni is located in the central part of the basin. However at the time the map did not yet indicate the location of Field G coal mine. As per Euracoal 2019 report, Field G mine extension was opened in 2017 with 36.5 million tonnes of lignite reserves.[15]
A media source from April 2023 reported that the Field G coal mine will be expanded. According to the decision of the Ministry of of Environmental Protection, the expansion of Field G was necessary due to the delay in the procurement of the equipment for Radjlevo coal mine. Extra volumes of coal would last for another year. The total amount of the coal projected for excavation from Field G was stated at 35 million tonnes, that is, 5 million a year.[14]
The national Energy Strategy of Serbia up to 2040 (with projections up to 2050) adopted in the second half of 2024 indicated that Field G is in the final stages of production and reserves shall be depleted until the beginning of 2026.[4]
National Coal Plans
In July 2024, Serbia adopted the final National Energy and Climate Plan highlighting that with the exception of some units, generally coal power plant capacities will be maintained and will not be dismantled until 2045.[18] The national Energy Strategy of Serbia up to 2040 (with projections up to 2050) indicated that coal production shall be gradually lowered. It is estimated that the demand for brown coal and dry lignite will be halved by 2040, in relation to the reference year 2021. Therefore, it is necessary to optimize and rationalize production in underground coal mining, close non-viable mines with almost depleted reserves and invest in viable and profitable mines. Remaining coal reserves should acquire strategic character and it is necessary to make investment in overburden excavation and slope stabilization.[4]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20240121033650/https://bankwatch.org/sites/default/files/Kolubara-resettlement.pdf. Archived from the original (PDF) on 21 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240121023610/https://euracoal.eu/info/country-profiles/serbia/. Archived from the original on 21 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20240121023556/https://caneurope.org/content/uploads/2021/09/Lazarevac-engl-web-FINAL-web.pdf. Archived from the original (PDF) on 21 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 "Energy Sector Development Strategy of the Republic of Serbia up to 2040 with Projections up to 2050 (Draft)" (PDF). www.mre.gov.rs. July 2024.
{{cite web}}
: line feed character in|title=
at position 35 (help)CS1 maint: url-status (link) - ↑ https://web.archive.org/web/20240718175024/https://www.ekapija.com/en/news/4171355/beginning-of-coal-exploitation-at-radljevo-mine-to-be-a-year-and. Archived from the original on 18 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240723042403/https://www.eps.rs/eng/Documents/financialreports/JP%2520EPS%2520consolidated%2520report%25202021.pdf. Archived from the original (PDF) on 23 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.eps.rs/eng/Documents/TEH_Godisnjak2017_web_EN_.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.eps.rs/eng/Documents/technicalreports/TEH_Godisnjak2018_web_en.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.eps.rs/cir/SiteAssets/Pages/tehnicki-izvestaji/TEH_Godisnjak2019_web_s.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.eps.rs/cir/SiteAssets/Pages/tehnicki-izvestaji/TEH_Godisnjak2020_web_s_.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.eps.rs/eng/Documents/technicalreports/TEH_Godisnjak2021_web_en_Fin.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.eps.rs/eng/Documents/technicalreports/20230421_TEH_Godisnjak2022_web_en_.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.eps.rs/eng/Documents/technicalreports/TEH_Godisnjak2023_web_en_.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 14.0 14.1 "Beginning of Coal Exploitation at Radljevo Mine to Be a Year and a Half Late – Field G to Be Expanded for the Purpose of Supplying TENT". https://www.ekapija.com/. April 2023.
{{cite web}}
: External link in
(help)CS1 maint: url-status (link)|website=
- ↑ 15.0 15.1 "Euracoal Serbia profile". euracoal.eu/. 2019.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "STRATEGIC ENVIRONMENTAL IMPACT ASSESSMENT OF THE SPATIAL PLAN OF KOLUBARA MINING BASIN AREA" (PDF). www.ebrd.com. December 2008.
{{cite web}}
: line feed character in|title=
at position 24 (help)CS1 maint: url-status (link) - ↑ "EPS 2017 Technical report" (PDF). eps.rs. 2018.
{{cite web}}
: CS1 maint: url-status (link) - ↑ (PDF) https://www.economy.gov.mk/content/Official%20NECP_EN.pdf.
{{cite web}}
: Missing or empty|title=
(help)CS1 maint: url-status (link)