Kotuń solar project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Kotuń solar project is an operating solar photovoltaic (PV) farm in Kotuń, Piła County, Masovian Voivodeship, Poland.

Project Details

Table 1: Phase-level project details for Kotuń solar project

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2024[1] 40 MWac[1] PV[1] Lightsource BP[1] Lightsource BP[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Kotuń solar project

Location Coordinates (WGS 84)
Kotuń, Piła County, Masovian Voivodeship, Poland[2] 52.1750, 22.0658 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://renews.biz/94654/lightsource-bp-powers-up-polish-pv-project/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://maps.app.goo.gl/ivi2i5gfmEBWCNtc7. {{cite web}}: Missing or empty |title= (help)