Kozhasai-KS12 Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Kozhasai-KS12 Gas Pipeline (Russian: Кожасай-КС12, Kazakh: Қожасай-КС12) is an operating gas pipeline in Kazakhstan.[1]
Location
The pipeline runs from Kozhasai oil and gas field to the Compressor Station 12 in Shalkar.[2]
Project details
- Operator: Intergas Central Asia[3]
- Owner: QazaqGaz (previously KazTransGas)[4][5]
- Parent company: Samruk-Kazyna SWF JSC[6]
- Capacity:
- Length: 168 km[2]
- Diameter: 325 mm[3]
- Status: Operating[3]
- Start year: 2017[3]
- Cost:
- Financing: JSC NC "KazMunayGas"[7]
- Associated infrastructure: Bukhara-Ural Gas Pipeline, Beineu-Bozoy-Shymkent Gas Pipeline
Background
The pipeline was constructed in order to reduce associated gas flaring at the fields of Aktobe region and increase the resource base for the Beineu-Bozoi-Shymkent gas pipeline. The pipeline connects to the Bukhara-Ural gas pipeline.
Articles and resources
References
- ↑ "Общая информация". Intergas Central Asia. Retrieved 2022-07-15.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 2.0 2.1 Годовой отчет АО «КазТрансГаз» за 2018 год. KazTransGas. 2019. p. 11.
- ↑ 3.0 3.1 3.2 3.3 Годовой отчет АО Интергаз Центральная Азия за 2020 год. Intergas Central Asia. 2021.
- ↑ "About the company". Intergas Central Asia. Retrieved 2022-07-15.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "KAZTRANSGAS REBRANDED AND BECAME QAZAQGAZ". QazaqGaz. Retrieved 2022-07-15.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "National company QazaqGaz JSC (KZTG) - Kazakhstan Stock Exchange (KASE)". kase.kz (in русский). Retrieved 2022-07-15.
- ↑ Годовой отчет АО «КазТрансГаз» за 2017 год. KazTransGas. 2018. p. 24.