Krasnodar power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Krasnodar power station (Краснодарская ТЭЦ) is an operating power station of at least 1030-megawatts (MW) in Krasnodar, Krasnodar Krai, Russia with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Krasnodar power station | Krasnodar, Krasnodar Krai, Russia | 45.0178, 39.0608 (exact)[1][2] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 6, 7, 7R, 8, 8R, 9, 9R, CC1: 45.0178, 39.0608
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year |
---|---|---|---|---|---|---|---|
6 | Operating[3][4] | fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] | 150[3][7][8] | steam turbine[9] | yes[9] | 1962[7] | – |
7 | Retired[3][10][4] | fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] | 145[7][11][3][12][8] | steam turbine[9] | yes[9] | 1962[7] | 2023[10] |
7R | Operating[13][10][14][15][16][17][18] | fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] | 150[13] | steam turbine[19] | yes[9] | 2023[13][4][20][10][14] | – |
8 | Operating[3][4] | fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] | 145[7][11][3][12][8] | steam turbine[9] | yes[9] | 1962[7] | 2024 (planned)[14][13][4] |
8R | Construction[13][21][10][14][22][23] | fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] | 150[13] | steam turbine[19] | yes[9] | 2024 (planned)[14][13][4][6] | – |
9 | Operating[3][6] | fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] | 145[7][11][3][12][8] | steam turbine[9] | yes[9] | 1962[7] | 2024 (planned)[13][14] |
9R | Pre-construction[13][10][14] | fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] | 150[13] | steam turbine[19] | yes[9] | 2024[13][14] | – |
CC1 | Operating[3][6][4] | fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] | 440[3][4] | combined cycle[3] | yes[9] | 2012[3] | – |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
6 | LUKOIL-Kubanenergo LLC [100%][3][24] | LUKOIL PJSC [100.0%] |
7 | LUKOIL-Kubanenergo LLC [100%][3][24] | LUKOIL PJSC [100.0%] |
7R | LUKOIL-Kubanenergo LLC [100%][3][24] | LUKOIL PJSC [100.0%] |
8 | LUKOIL-Kubanenergo LLC [100%][3][24] | LUKOIL PJSC [100.0%] |
8R | LUKOIL-Kubanenergo LLC [100%][3][24] | LUKOIL PJSC [100.0%] |
9 | LUKOIL-Kubanenergo LLC [100%][3][24] | LUKOIL PJSC [100.0%] |
9R | LUKOIL-Kubanenergo LLC [100%][3][24] | LUKOIL PJSC [100.0%] |
CC1 | LUKOIL-Kubanenergo LLC [100%][3][24] | LUKOIL PJSC [100.0%] |
Background
The units listed on this page as 6, 7, 8, 9 are sometimes listed as 1, 2, 3, 4 in company and government documents.[25] The units became operational in 1962-1966.[26] In the database, the start year is listed as the earliest 1962.
In May 2019, the project for the modernization of three 145-MW units was approved by the government commission on the development of the electric power industry. This project includes replacement of the turbine units 1-3 and of the main elements of the boiler equipment.[27] In October 2020, it appeared that instead of replacing the turbine units, the company decided to update the existing equipment (replacing the rotors only) and was searching for a supplier of this equipment.[28] There were also several tenders that received no applications since the announcement of the project in 2019, likely delaying the modernization project.[28]
In October 2021 and October 2022, the Ural Pipe Plant completed manufacturing the first and second of three turbines (turbine type: ПТ-150/160-12,8) to be supplied for this project, respectively, indicating that turbine replacement will be soon going ahead.[29][30] The contract for the supply of three sets of turbine equipment was signed in 2020 with LUKOIL-Kubanenergo. The third turbine is expected to be manufactured in 2023.[29] As of October 2022, modernization works were underway without specific updates on the stage of the first or second turbines.[31]
In December 2021, construction work and installation of the main turbine equipment were ongoing at Unit 7, meaning that Unit 7R has advanced to construction.[32] Since the turbine has been manufactured for Unit 8R in October 2022, it is fair to assume that at that time the unit has advanced to pre-construction.[33]
In September 2023, Unit 7R began operating and Unit 7 was retired. In November 2023, Unit 8R was successfully tested.[34] It is expected to be commissioned in 2024.[35] In March 2024, the Ural Chemical Machinery Plant (Uralhimmash) manufactured and shipped the second set of drums with internal devices intended for the TGМ-94 boilers at the Krasnodar power station. The shipment of the third set is expected by the end of 2024.[36] The Russian Ministry of Energy 2024-2029 energy program does not mention replacement of Unit 9 and lists its current and future installed capacity as 145 MW. [35] Thus, the unit might be upgraded without replacement of the turbine.
Articles and Resources
References
- ↑ https://web.archive.org/web/20170921031918/http://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32679-krasnodarskaya-gas-power-plant. Archived from the original on 21 September 2017.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.google.com/maps/place/Krasnodarskaya+Tets/@45.0165659,39.0595532,470m/data=!3m1!1e3!4m5!3m4!1s0x40f0516874332a5b:0x60409a2ad052e581!8m2!3d45.0158042!4d39.0612815.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 https://web.archive.org/web/20211127110203/https://kubanenergo.lukoil.ru/ru/About/GeneratingFacilities. Archived from the original on 27 November 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20230313034526/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/22_Krasnodarskii_krai_fin.pdf. Archived from the original (PDF) on 13 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://www.so-ups.ru/odu-south/odu-south-zone/objsouth/krasnodarskaja-tehc/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 (PDF) https://web.archive.org/web/20240120035203/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/22_Krasnodarskii_krai.pdf. Archived from the original (PDF) on 20 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 https://web.archive.org/web/20210902192356/https://www.rosteplo.ru/w/%D0%9A%D1%80%D0%B0%D1%81%D0%BD%D0%BE%D0%B4%D0%B0%D1%80%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 02 September 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 https://web.archive.org/web/20220704100946/https://ru.wikipedia.org/wiki/%D0%9A%D1%80%D0%B0%D1%81%D0%BD%D0%BE%D0%B4%D0%B0%D1%80%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 04 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 https://energybase.ru/power-plant/Krasnodar_CHP.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 10.4 10.5 https://energyland.info/news-show-tek-electro-249997.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 11.0 11.1 11.2 (PDF) https://web.archive.org/web/20150418183827/http://krd.ru/uploads/files/2015/02/18/18367-03401.st-pst.000.000.pdf. Archived from the original (PDF) on 18 April 2015.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 12.0 12.1 12.2 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 https://web.archive.org/web/20220708172928/https://neftegaz.ru/news/energy/452136-odobren-proekt-modernizatsii-krasnodarskoy-tets-lukoyla/. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 https://web.archive.org/web/20220608102139/https://neftegaz.ru/news/vtrende/704501-uralskiy-turbinnyy-zavod-zavershil-izgotovlenie-pervoy-iz-trekh-turbin-dlya-krasnodarskoy-tets/. Archived from the original on 08 June 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://kubanenergo.lukoil.ru/ru/News/News?rid=571378.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220126125629/https://docs.cntd.ru/document/560853903. Archived from the original on 26 January 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ http://government.ru/docs/all/123337/?page=3.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221222144408/http://www.kommersant.ru/doc/5646219. Archived from the original on 22 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 19.0 19.1 19.2 https://web.archive.org/web/20220708171428/https://www.tek-all.ru/news/id7474-gazprombank-obespechit-kontrol-za-effektivnim-rashodovaniem-denezhnih-sredstv-pri-modernizatsii-krasnodarskoy-tets/. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://energybase.ru/news/industry/zapusku-obnovlennyh-energoblokov-ne-hvataet-detalej-2022-11-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240506213000/https://uralhimmash.ru/press/news/uralkhimmash-postavit-oborudovanie-dlya-povysheniya-nadezhnosti-krasnodarskoy-tets/. Archived from the original on 06 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221216113036/https://www.utz.ru/press/news/uralskiy-turbinnyy-zavod-izgotovil-vtoruyu-turbinu/. Archived from the original on 16 December 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220918125016/https://neftegaz.ru/news/energy/740026-lukoyl-prodolzhaet-modernizatsiyu-energoblokov-na-krasnodarskoy-tets/. Archived from the original on 18 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 24.0 24.1 24.2 24.3 24.4 24.5 24.6 24.7 https://web.archive.org/web/20230107205030/https://www.so-ups.ru/functioning/ees/oes-south/. Archived from the original on 07 January 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ "СХЕМА ТЕПЛОСНАБЖЕНИЯ МУНИЦИПАЛЬНОГО ОБРАЗОВАНИЯ ГОРОД КРАСНОДАР ДО 2030 ГОДА" (PDF).
{{cite web}}
: line feed character in|title=
at position 21 (help)CS1 maint: url-status (link) - ↑ "www.rosteplo.ru/w/%D0%9A%D1%80%D0%B0%D1%81%D0%BD%D0%BE%D0%B4%D0%B0%D1%80%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6". Archived from the original on September 2, 2021.
- ↑ "Одобрен проект модернизации Краснодарской ТЭЦ ЛУКОЙЛа". Neftegaz.ru. May 30, 2019. Retrieved May 2, 2022.
- ↑ 28.0 28.1 "ЛУКОЙЛ-Кубаньэнерго ищет поставщика оборудования для генераторов Краснодарской ТЭЦ за 351 млн руб". Interfax Russia. Oct 12, 2020. Retrieved May 2, 2022.
- ↑ 29.0 29.1 "Уральский турбинный завод завершил изготовление первой из трех турбин для Краснодарской ТЭЦ". Neftegaz.ru. Oct 27, 2021. Retrieved May 2, 2022.
- ↑ "Уральский турбинный завод". www.utz.ru. Retrieved 2022-11-01.
- ↑ "ЛУКОЙЛ продолжает модернизацию энергоблоков на Краснодарской ТЭЦ".
{{cite web}}
: CS1 maint: url-status (link) - ↑ "НА КРАСНОДАРСКОЙ ТЭЦ ООО «ЛУКОЙЛ-КУБАНЬЭНЕРГО» ПРИСТУПИЛИ К МОНТАЖУ ОСНОВНОГО ОБОРУДОВАНИЯ В РАМКАХ ДПМ-2". kubanenergo.lukoil.ru. Dec 17, 2021. Retrieved Nov 3, 2022.
- ↑ "Уральский турбинный завод изготовил вторую турбину для ключевой ТЭЦ Краснодарского края". utz.ru. Oct 3, 2022. Retrieved Nov 3, 2022.
- ↑ "УТЗ провел стендовые испытания третьей турбины Краснодарской ТЭЦ". energyland.info. November 9, 2023. Retrieved November 17, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 35.0 35.1 "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ ЭНЕРГОСИСТЕМА РЕСПУБЛИКИ АДЫГЕЯ И КРАСНОДАРСКОГО КРАЯ" (PDF). SO UPS of Russia. November 30, 2024. Retrieved April 22, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Оборудование «Уралхиммаша» повысит надежность Краснодарской ТЭЦ". MASHNEWS. March 29, 2024. Retrieved April 22, 2024.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.