Krasnodar power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Krasnodar power station (Краснодарская ТЭЦ) is an operating power station of at least 1030-megawatts (MW) in Krasnodar, Krasnodar Krai, Russia with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Krasnodar power station Krasnodar, Krasnodar Krai, Russia 45.0178, 39.0608 (exact)[1][2]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • 6, 7, 7R, 8, 8R, 9, 9R, CC1: 45.0178, 39.0608

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
6 Operating[3][4] fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] 150[3][7][8] steam turbine[9] yes[9] 1962[7]
7 Retired[3][10][4] fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] 145[7][11][3][12][8] steam turbine[9] yes[9] 1962[7] 2023[10]
7R Operating[13][10][14][15][16][17][18] fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] 150[13] steam turbine[19] yes[9] 2023[13][4][20][10][14]
8 Operating[3][4] fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] 145[7][11][3][12][8] steam turbine[9] yes[9] 1962[7] 2024 (planned)[14][13][4]
8R Construction[13][21][10][14][22][23] fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] 150[13] steam turbine[19] yes[9] 2024 (planned)[14][13][4][6]
9 Operating[3][6] fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] 145[7][11][3][12][8] steam turbine[9] yes[9] 1962[7] 2024 (planned)[13][14]
9R Pre-construction[13][10][14] fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] 150[13] steam turbine[19] yes[9] 2024[13][14]
CC1 Operating[3][6][4] fossil gas: natural gas, fossil liquids: diesel, fossil liquids: heavy fuel oil[3][5][6] 440[3][4] combined cycle[3] yes[9] 2012[3]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
6 LUKOIL-Kubanenergo LLC [100%][3][24] LUKOIL PJSC [100.0%]
7 LUKOIL-Kubanenergo LLC [100%][3][24] LUKOIL PJSC [100.0%]
7R LUKOIL-Kubanenergo LLC [100%][3][24] LUKOIL PJSC [100.0%]
8 LUKOIL-Kubanenergo LLC [100%][3][24] LUKOIL PJSC [100.0%]
8R LUKOIL-Kubanenergo LLC [100%][3][24] LUKOIL PJSC [100.0%]
9 LUKOIL-Kubanenergo LLC [100%][3][24] LUKOIL PJSC [100.0%]
9R LUKOIL-Kubanenergo LLC [100%][3][24] LUKOIL PJSC [100.0%]
CC1 LUKOIL-Kubanenergo LLC [100%][3][24] LUKOIL PJSC [100.0%]

Background

The units listed on this page as 6, 7, 8, 9 are sometimes listed as 1, 2, 3, 4 in company and government documents.[25] The units became operational in 1962-1966.[26] In the database, the start year is listed as the earliest 1962.

In May 2019, the project for the modernization of three 145-MW units was approved by the government commission on the development of the electric power industry. This project includes replacement of the turbine units 1-3 and of the main elements of the boiler equipment.[27] In October 2020, it appeared that instead of replacing the turbine units, the company decided to update the existing equipment (replacing the rotors only) and was searching for a supplier of this equipment.[28] There were also several tenders that received no applications since the announcement of the project in 2019, likely delaying the modernization project.[28]

In October 2021 and October 2022, the Ural Pipe Plant completed manufacturing the first and second of three turbines (turbine type: ПТ-150/160-12,8) to be supplied for this project, respectively, indicating that turbine replacement will be soon going ahead.[29][30] The contract for the supply of three sets of turbine equipment was signed in 2020 with LUKOIL-Kubanenergo. The third turbine is expected to be manufactured in 2023.[29] As of October 2022, modernization works were underway without specific updates on the stage of the first or second turbines.[31]

In December 2021, construction work and installation of the main turbine equipment were ongoing at Unit 7, meaning that Unit 7R has advanced to construction.[32] Since the turbine has been manufactured for Unit 8R in October 2022, it is fair to assume that at that time the unit has advanced to pre-construction.[33]

In September 2023, Unit 7R began operating and Unit 7 was retired. In November 2023, Unit 8R was successfully tested.[34] It is expected to be commissioned in 2024.[35] In March 2024, the Ural Chemical Machinery Plant (Uralhimmash) manufactured and shipped the second set of drums with internal devices intended for the TGМ-94 boilers at the Krasnodar power station. The shipment of the third set is expected by the end of 2024.[36] The Russian Ministry of Energy 2024-2029 energy program does not mention replacement of Unit 9 and lists its current and future installed capacity as 145 MW. [35] Thus, the unit might be upgraded without replacement of the turbine.

Articles and Resources

References

  1. https://web.archive.org/web/20170921031918/http://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32679-krasnodarskaya-gas-power-plant. Archived from the original on 21 September 2017. {{cite web}}: Missing or empty |title= (help)
  2. https://www.google.com/maps/place/Krasnodarskaya+Tets/@45.0165659,39.0595532,470m/data=!3m1!1e3!4m5!3m4!1s0x40f0516874332a5b:0x60409a2ad052e581!8m2!3d45.0158042!4d39.0612815. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 3.25 3.26 3.27 https://web.archive.org/web/20211127110203/https://kubanenergo.lukoil.ru/ru/About/GeneratingFacilities. Archived from the original on 27 November 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 (PDF) https://web.archive.org/web/20230313034526/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/22_Krasnodarskii_krai_fin.pdf. Archived from the original (PDF) on 13 March 2023. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://www.so-ups.ru/odu-south/odu-south-zone/objsouth/krasnodarskaja-tehc/. {{cite web}}: Missing or empty |title= (help)
  6. 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 (PDF) https://web.archive.org/web/20240120035203/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/22_Krasnodarskii_krai.pdf. Archived from the original (PDF) on 20 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 https://web.archive.org/web/20210902192356/https://www.rosteplo.ru/w/%D0%9A%D1%80%D0%B0%D1%81%D0%BD%D0%BE%D0%B4%D0%B0%D1%80%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 02 September 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 https://web.archive.org/web/20220704100946/https://ru.wikipedia.org/wiki/%D0%9A%D1%80%D0%B0%D1%81%D0%BD%D0%BE%D0%B4%D0%B0%D1%80%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6. Archived from the original on 04 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  9. 9.00 9.01 9.02 9.03 9.04 9.05 9.06 9.07 9.08 9.09 9.10 9.11 https://energybase.ru/power-plant/Krasnodar_CHP. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 10.2 10.3 10.4 10.5 https://energyland.info/news-show-tek-electro-249997. {{cite web}}: Missing or empty |title= (help)
  11. 11.0 11.1 11.2 (PDF) https://web.archive.org/web/20150418183827/http://krd.ru/uploads/files/2015/02/18/18367-03401.st-pst.000.000.pdf. Archived from the original (PDF) on 18 April 2015. {{cite web}}: Missing or empty |title= (help)
  12. 12.0 12.1 12.2 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022. {{cite web}}: Missing or empty |title= (help)
  13. 13.00 13.01 13.02 13.03 13.04 13.05 13.06 13.07 13.08 13.09 13.10 https://web.archive.org/web/20220708172928/https://neftegaz.ru/news/energy/452136-odobren-proekt-modernizatsii-krasnodarskoy-tets-lukoyla/. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 14.6 14.7 https://web.archive.org/web/20220608102139/https://neftegaz.ru/news/vtrende/704501-uralskiy-turbinnyy-zavod-zavershil-izgotovlenie-pervoy-iz-trekh-turbin-dlya-krasnodarskoy-tets/. Archived from the original on 08 June 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  15. https://kubanenergo.lukoil.ru/ru/News/News?rid=571378. {{cite web}}: Missing or empty |title= (help)
  16. https://web.archive.org/web/20220126125629/https://docs.cntd.ru/document/560853903. Archived from the original on 26 January 2022. {{cite web}}: Missing or empty |title= (help)
  17. http://government.ru/docs/all/123337/?page=3. {{cite web}}: Missing or empty |title= (help)
  18. https://web.archive.org/web/20221222144408/http://www.kommersant.ru/doc/5646219. Archived from the original on 22 December 2022. {{cite web}}: Missing or empty |title= (help)
  19. 19.0 19.1 19.2 https://web.archive.org/web/20220708171428/https://www.tek-all.ru/news/id7474-gazprombank-obespechit-kontrol-za-effektivnim-rashodovaniem-denezhnih-sredstv-pri-modernizatsii-krasnodarskoy-tets/. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  20. https://energybase.ru/news/industry/zapusku-obnovlennyh-energoblokov-ne-hvataet-detalej-2022-11-02. {{cite web}}: Missing or empty |title= (help)
  21. https://web.archive.org/web/20240506213000/https://uralhimmash.ru/press/news/uralkhimmash-postavit-oborudovanie-dlya-povysheniya-nadezhnosti-krasnodarskoy-tets/. Archived from the original on 06 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  22. https://web.archive.org/web/20221216113036/https://www.utz.ru/press/news/uralskiy-turbinnyy-zavod-izgotovil-vtoruyu-turbinu/. Archived from the original on 16 December 2022. {{cite web}}: Missing or empty |title= (help)
  23. https://web.archive.org/web/20220918125016/https://neftegaz.ru/news/energy/740026-lukoyl-prodolzhaet-modernizatsiyu-energoblokov-na-krasnodarskoy-tets/. Archived from the original on 18 September 2022. {{cite web}}: Missing or empty |title= (help)
  24. 24.0 24.1 24.2 24.3 24.4 24.5 24.6 24.7 https://web.archive.org/web/20230107205030/https://www.so-ups.ru/functioning/ees/oes-south/. Archived from the original on 07 January 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  25. "СХЕМА ТЕПЛОСНАБЖЕНИЯ МУНИЦИПАЛЬНОГО ОБРАЗОВАНИЯ ГОРОД КРАСНОДАР ДО 2030 ГОДА" (PDF). {{cite web}}: line feed character in |title= at position 21 (help)CS1 maint: url-status (link)
  26. "www.rosteplo.ru/w/%D0%9A%D1%80%D0%B0%D1%81%D0%BD%D0%BE%D0%B4%D0%B0%D1%80%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6". Archived from the original on September 2, 2021.
  27. "Одобрен проект модернизации Краснодарской ТЭЦ ЛУКОЙЛа". Neftegaz.ru. May 30, 2019. Retrieved May 2, 2022.
  28. 28.0 28.1 "ЛУКОЙЛ-Кубаньэнерго ищет поставщика оборудования для генераторов Краснодарской ТЭЦ за 351 млн руб". Interfax Russia. Oct 12, 2020. Retrieved May 2, 2022.
  29. 29.0 29.1 "Уральский турбинный завод завершил изготовление первой из трех турбин для Краснодарской ТЭЦ". Neftegaz.ru. Oct 27, 2021. Retrieved May 2, 2022.
  30. "Уральский турбинный завод". www.utz.ru. Retrieved 2022-11-01.
  31. "ЛУКОЙЛ продолжает модернизацию энергоблоков на Краснодарской ТЭЦ".{{cite web}}: CS1 maint: url-status (link)
  32. "НА КРАСНОДАРСКОЙ ТЭЦ ООО «ЛУКОЙЛ-КУБАНЬЭНЕРГО» ПРИСТУПИЛИ К МОНТАЖУ ОСНОВНОГО ОБОРУДОВАНИЯ В РАМКАХ ДПМ-2". kubanenergo.lukoil.ru. Dec 17, 2021. Retrieved Nov 3, 2022.
  33. "Уральский турбинный завод изготовил вторую турбину для ключевой ТЭЦ Краснодарского края". utz.ru. Oct 3, 2022. Retrieved Nov 3, 2022.
  34. "УТЗ провел стендовые испытания третьей турбины Краснодарской ТЭЦ". energyland.info. November 9, 2023. Retrieved November 17, 2023.{{cite web}}: CS1 maint: url-status (link)
  35. 35.0 35.1 "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ ЭНЕРГОСИСТЕМА РЕСПУБЛИКИ АДЫГЕЯ И КРАСНОДАРСКОГО КРАЯ" (PDF). SO UPS of Russia. November 30, 2024. Retrieved April 22, 2024.{{cite web}}: CS1 maint: url-status (link)
  36. "Оборудование «Уралхиммаша» повысит надежность Краснодарской ТЭЦ". MASHNEWS. March 29, 2024. Retrieved April 22, 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.