Krasny Most-Alaverdi Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Krasny Most-Alaverdi Gas Pipeline, is an operating gas pipeline in Armenia.[1]

Location

The pipeline runs from Krasny Most (Qırmızı Körpü/ Tsiteli Khidi) to Alaverdi, Armenia.[1]

Loading map...

Project details

  • Operator: Transgaz LLC[2]
  • Owner: CJSC Gazprom Armenia[2]
  • Parent company: Gazprom[3]
  • Capacity: 0.004 bcm/y[4]
  • Length: 55 km[1]
  • Diameter: 500 mm, 700 mm[4]
  • Status: Operating[2]
  • Start year: 1964[1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "История". armenia.gazprom.ru (in русский). Retrieved 2022-08-18.
  2. 2.0 2.1 2.2 "About us". armenia.gazprom.com. Retrieved 2022-08-18.
  3. "About us". armenia.gazprom.com. Retrieved 2022-08-18.
  4. 4.0 4.1 "ПОВТОРНЫЙ ОБЗОР инвестиционного климата и структуры рынка в энергетическом секторе" (PDF). energycharter.org. 2008. Retrieved 2022-08-18.{{cite web}}: CS1 maint: url-status (link)