Krasny Most-Sevkar-Berd Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Krasny Most-Sevkar-Berd Gas Pipeline, is an operating gas pipeline in Armenia.[1]

Location

The pipeline runs from Kransy Most (Qırmızı Körpü/ Tsiteli Khidi) to Sevkar, to Berd, Armenia.[1]

Loading map...

Project details

  • Operator: Transgaz LLC[2]
  • Owner: CJSC Gazprom Armenia[2]
  • Parent company: Gazprom[3]
  • Capacity: 1.71 bcm/y[4]
  • Length: 61.8 km[1]
  • Diameter: 1000 mm[4]
  • Status: Operating[2]
  • Start year: 1993[1]
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "История". armenia.gazprom.ru (in русский). Retrieved 2022-08-18.
  2. 2.0 2.1 2.2 "About us". armenia.gazprom.com. Retrieved 2022-08-18.
  3. "About us". armenia.gazprom.com. Retrieved 2022-08-18.
  4. 4.0 4.1 "ПОВТОРНЫЙ ОБЗОР инвестиционного климата и структуры рынка в энергетическом секторе" (PDF). energycharter.org. 2008. Retrieved 2022-08-18.{{cite web}}: CS1 maint: url-status (link)