Kuala Langat (Advancecon) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Kuala Langat (Advancecon) solar farm is a solar photovoltaic (PV) farm in pre-construction in Kuala Langat, Selangor, Malaysia.

Project Details

Table 1: Phase-level project details for Kuala Langat (Advancecon) solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 26 MWac[2] PV[2] Advancecon Solar Sdn Bhd [100%][3] Advancecon Solar[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Kuala Langat (Advancecon) solar farm

Location Coordinates (WGS 84)
Kuala Langat, Selangor, Malaysia[4] 3.0840, 101.7442 (approximate)[4]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://solarquarter.com/2023/01/25/advancecon-holdings-proposes-private-placement-to-raise-funds-for-solar-pv-project/ https://solarquarter.com/2022/08/22/advancecon-holdings-bhd-receives-a-four-year-extension-for-its-26-mw-solar-pv-project/, https://solarquarter.com/2023/01/25/advancecon-holdings-proposes-private-placement-to-raise-funds-for-solar-pv-project/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240308203739/https://solarquarter.com/2022/08/22/advancecon-holdings-bhd-receives-a-four-year-extension-for-its-26-mw-solar-pv-project/. Archived from the original on 2024-03-08. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240206190956/https://theedgemalaysia.com/article/advancecon-inks-agreement-tnb-build-and-operate-solar-pv-facility. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240206172433/https://theedgemalaysia.com/article/advancecon-inks-agreement-tnb-build-and-operate-solar-pv-facility. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)