Kun Bulagi solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Kun Bulagi solar farm is a solar photovoltaic (PV) farm in pre-construction in Toru-Aygyr, Issyk-Kul, Kyrgyzstan.

Project Details

Table 1: Phase-level project details for Kun Bulagi solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 50 MW[2] PV[2] TGS-Energy Ltd; Taza Energy[3] Kun Bulagi[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Kun Bulagi solar farm

Location Coordinates (WGS 84)
Toru-Aygyr, Issyk-Kul, Kyrgyzstan[5] 42.4947, 76.4267 (approximate)[5]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.kunbulagy.com/index.php/ru/novosti/203-nachaty-raboty-nad-stroitelstvom-ses-kun-bulagy https://www.vb.kg/doc/430853_v_issyk_kylskom_rayone_pristypaut_k_stroitelstvy_solnechnoy_elektrostancii.html, https://www.kunbulagy.com/index.php/ru/novosti/203-nachaty-raboty-nad-stroitelstvom-ses-kun-bulagy. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240201130259/https://www.vb.kg/doc/430853_v_issyk_kylskom_rayone_pristypaut_k_stroitelstvy_solnechnoy_elektrostancii.html. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  3. https://economist.kg/novosti/2023/05/04/kyrgyzsko-kazahskaya-kompaniya-postroit-v-issyk-kulskoj-oblasti-solnechnuju-elektrostanciju-k-2024-godu/ https://economist.kg/novosti/2023/05/04/kyrgyzsko-kazahskaya-kompaniya-postroit-v-issyk-kulskoj-oblasti-solnechnuju-elektrostanciju-k-2024-godu/, https://economist.kg/novosti/2023/05/04/kyrgyzsko-kazahskaya-kompaniya-postroit-v-issyk-kulskoj-oblasti-solnechnuju-elektrostanciju-k-2024-godu/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  4. https://ru.sputnik.kg/20221228/issyk-kul-solnechnaya-ehlektrostanciya-1071548239.html https://www.vb.kg/doc/430853_v_issyk_kylskom_rayone_pristypaut_k_stroitelstvy_solnechnoy_elektrostancii.html, https://ru.sputnik.kg/20221228/issyk-kul-solnechnaya-ehlektrostanciya-1071548239.html. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.0 5.1 https://web.archive.org/web/20240206161045/https://economist.kg/novosti/2023/05/04/kyrgyzsko-kazahskaya-kompaniya-postroit-v-issyk-kulskoj-oblasti-solnechnuju-elektrostanciju-k-2024-godu/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)