Kunnar Pasakhi Deep-Tando Allah Yar (KPD-TAY) Oil and Gas Project (Pakistan)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

Kunnar Pasakhi Deep-Tando Allah Yar (KPD-TAY) Oil and Gas Project is an operating oil and gas project in Pakistan.


The project consists of the following units:

  • Kunnar Pasakhi Deep Oil and Gas Field (Pakistan)
  • Tando Allah Yar Oil and Gas Field (Pakistan)

Project Details

Main Data

Table 1: Project-level project details for Kunnar Pasakhi Deep-Tando Allah Yar (KPD-TAY) Oil and Gas Project

1Final Investment Decision
2If a country or region is known to not produce any hydrocarbons in an unconventional method, this production type is assumed to be conventional
Unit name Status Operator Owner Discovery year FID1 year Production start year Production type2
Kunnar Pasakhi Deep-Tando Allah Yar (KPD-TAY) Operating[1] Oil and Gas Development Company Limited[1] Government Holdings (Private) Limited (22.5%); Oil and Gas Development Company Limited[1] Conventional

Production and Reserves

Table 2: Production from Kunnar Pasakhi Deep-Tando Allah Yar (KPD-TAY) Oil and Gas Project

million m³/y = million cubic meters per year
million bbl/y = million barrels of oil per year
Category Fuel description Quantity Units Data year Source
production gas 671.81 million m³/y 2017 [1]
production LPG 0.49 million bbl/y 2017 [1]
production oil and condensate 0.73 million bbl/y 2017 [1]

Location

Table 3: Project-level location details for Kunnar Pasakhi Deep-Tando Allah Yar (KPD-TAY) Oil and Gas Project

Location Onshore/Offshore Coordinates (WGS 84)
Unknown, Pakistan Unknown No location data found

Articles and Resources

Additional Data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References