Läntinen wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Läntisneva, Läntisnev, Läntinen-Kalajoki

Läntinen wind farm is an operating wind farm in North Ostrobothnia, Regional State Administrative Agency for Northern Finland, Finland.

Project Details

Table 1: Phase-level project details for Läntinen wind farm

Status Commissioning year Nameplate capacity Type Owner
Operating[1][2] 2023[2] 80 MW[1] Onshore[1] BlackRock Real Assets [100%][2]

Location

Table 2: Phase-level location details for Läntinen wind farm

Location Coordinates (WGS 84)
North Ostrobothnia, Regional State Administrative Agency for Northern Finland, Finland[3] 64.182, 23.921 (exact)[3]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20221208072436/https://www.winda.fi/l%C3%A4ntinen-kalajoki. Archived from the original on 08 December 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://web.archive.org/web/20240125152732/https://tuulivoimayhdistys.fi/en/wind-power-in-finland/wind-power-in-production-and-dismantled. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240125203630/https://tuulivoimayhdistys.fi/en/wind-power-in-finland/map. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)