La Vaguada solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

La Vaguada solar farm (Planta solar fotovoltaica La Vaguada) is a solar photovoltaic (PV) farm in pre-construction in Cedillo del Condado, Toledo, Castilla-La Mancha, Spain.

Project Details

Table 1: Phase-level project details for La Vaguada solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 88.2 MWac[2] PV[3] Viridi RE [100%][4] Lirio Desarrollos España[5]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for La Vaguada solar farm

Location Coordinates (WGS 84)
Cedillo del Condado, Toledo, Castilla-La Mancha, Spain[5] 40.1158, -3.9133 (approximate)[5]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12637, https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-3818 https://www.pv-magazine.es/2023/03/29/viridi-obtiene-la-dia-para-la-construccion-de-un-proyecto-de-108-mwp-en-toledo/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12637, https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-3818. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12637 https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-3818, https://www.boe.es/diario_boe/txt.php?id=BOE-A-2023-12637. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. "Cepsa, Iberdrola y Solaria son las empresas que más potencia fotovoltaica presentaron en 2022". Energía Estratégica España. 2023-01-03. Archived from the original on 2024-02-01.
  4. https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/ https://www.pv-magazine.es/2023/03/29/viridi-obtiene-la-dia-para-la-construccion-de-un-proyecto-de-108-mwp-en-toledo/, https://energiaestrategica.es/cepsa-iberdrola-y-solaria-son-las-empresas-que-mas-potencia-fotovoltaica-presentaron-en-2022/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 "BOE-A-2023-12637 Resolución de 23 de abril de 2023, de la Dirección General de Política Energética y Minas, por la que se otorga a Lirio Desarrollos España, SL, la autorización administrativa previa para la instalación solar fotovoltaica "La Vaguada", de 108,8 MW de potencia pico y 88,2 MW de potencia instalada". Boletín Oficial del Estado. 2023-05-29. Archived from the original on 2024-04-09. Retrieved 2024-03-22.