Laguna Colorada geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Laguna Colorada geothermal power plant (Central geotérmica Laguna Colorada) is a geothermal power plant under construction in Sud Lípez, Potosí, Bolivia.
Project Details
Table 1: Unit-level project details for Laguna Colorada geothermal power plant
Unit name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Construction[1] | 2026 (planned)[1] | 50 MW[2][3] | Unknown type | Empresa Nacional de Electricidad SA (ENDE) [100%][4] | Empresa Nacional de Electricidad SA (ENDE)[4] |
2 | Construction[1] | 2026 (planned)[1] | 50 MW[2][3] | Unknown type | Empresa Nacional de Electricidad SA (ENDE) [100%][4] | Empresa Nacional de Electricidad SA (ENDE)[4] |
Location
Table 2: Unit-level location details for Laguna Colorada geothermal power plant
Unit name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Sud Lípez, Potosí, Bolivia | -22.4429, -67.806 (approximate) |
2 | Sud Lípez, Potosí, Bolivia | -22.4429, -67.806 (approximate) |
The map below shows the approximate locations of the geothermal power plant units:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20240319061612/https://www.worldconstructionnetwork.com/data-insights/construction-laguna-colorada-geothermal-power-plant-100-mw/. Archived from the original on 19 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20230305002620/https://www.ende.bo/proyectos/resena/proyecto--const.-central-geotermica-de-laguna-colorada. Archived from the original on 05 March 2023.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20221209030456/https://www.energias-renovables.com/geotermica/sacyr-y-ormat-se-adjudican-la-construccion-20190405. Archived from the original on 09 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20220720050257/https://www.thinkgeoenergy.com/construction-of-bolivias-first-geothermal-plant-progressing/. Archived from the original on 20 July 2022.
{{cite web}}
: Missing or empty|title=
(help)