Lansing Board of Water and Light

From Global Energy Monitor

Lansing Board of Water and Light is an operating power station of at least 98-megawatts (MW) in Delta Twp., Michigan, United States with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Lansing Board of Water and Light Delta Twp., Michigan, United States 42.726516, -84.661396 (approximate)

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
Cancelled coal: subbituminous 350 subcritical
CC1 Operating[1] fossil gas: natural gas[1] 98[1] combined cycle[1] yes[1] 2013[1]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Lansing Board of Water and Light [100%] Lansing Board of Water and Light [100.0%]
CC1 Lansing Board of Water and Light [100%] Lansing Board of Water and Light [100.0%]

Background

In late May 2008, the Lansing Board of Water and Light (LBWL) proposed the construction of a 350 megawatt (MW), 1 billion dollar power plant to be fired primarily by coal.[2] In an internal review, LBWL considered several different options including a projected carbon tax of $10 per ton.[3][4]

LBWL decided that upgrading the current Eckert Power Station would not be an economical choice. LBWL claims an electric growth rate for the service area or 1.4% per year, in spite of the generally flattened demand for power in the state as a whole. LBWL has indicated an intention to meet new growth though energy efficiency and renewables, but claims a need for replacement of base load power, and that transmission costs make purchase of outside power too expensive.[2]

LBWL has been criticized for not including community and environmental groups in the decision making process.[5]

The Lansing State Journal has noted that with the changing climate for coal development, this project and others around the state may be in trouble.[6]

On February 3, 2009, in her State of the State address, Governor Granholm asked the Michigan DEQ to halt the permitting process for seven proposed power plants, including the Lansing plant. She called for further analysis of Michigan's future energy needs and clean energy alternatives.[7]

BWL Announces Co-Generation Plan

On July 16, 2010, the Lansing Board of Water and Light announced[8]it will build a $182 million combined-cycle, cogeneration plant that produces both electricity and steam for its customers. According to the BWL press release, "The highly efficient, state-of-the art facility will be fueled by natural gas, not coal. The switch to natural gas will reduce greenhouse gas emissions by 50 percent, compared to the BWL’s existing steam plant."

Bwl.jpg

"By switching to natural gas at the new facility, the BWL will avoid burning 139,000 tons of coal each year. Greenhouse gas emissions will be dramatically reduced – 50 percent less than Moores Park." the release stated. The facility will also derive efficiencies through a "combined heat and power" approach, with 225 steam customers, including government offices for the State of Michigan and the City of Lansing; the Accident Fund, Lansing Community College, Boji Tower, the state Capitol building and the new Michigan State Police Headquarters.

Michigan Sierra Club director Anne Woidwode expressed satisfaction with the move, in an emailing, saying, "while we are still looking at a fossil fuel, this turnaround is a dramatic reminder of the power of the public in a publicly owned system to insist on better ideas."

The plan is for wind turbines and solar panels to be integrated into the facility's roof. BWL is already owner of the Cedar Street solar array, the state's largest.

BWL and coal ash in Granger, MI

BWL began transporting more than 400,000 cubic yards of coal ash residue generated from its now defunct Ottawa Power Station between 1964 and 1978 to a landfill in Granger, Michigan. In 2009, BWL started removing the ash, and in 2010 said it had removed about 35 percent of the coal ash so far. BWL projects the project should last about a year to a year and a half, at which point they will fill it all in, and plant some trees. Responding to resident concerns about safety, BWL's executive director of planning George Stojic admitted there "is leaching into the upper aquifer of some trace minerals, not into the drinking water." Officials promised to be as open as they could with test results of the minerals leaking into the upper aquifer. Susan Harley, policy associate for Clean Water Action, said Stojic's report wasn't satisfactory, and vowed to follow up with state environment officials.[9]

Elevated levels of arsenic and mercury found

A 2010 investigation found elevated levels of arsenic and mercury in run-off from a site where the Lansing Board of Water & Light is storing coal ash near Grand River, Michigan. A sample taken from soil that had breached a broken silt fence at the facility after a heavy rain in September showed arsenic and mercury at more than twice the maximum normal level. Stephen Boyd, a professor of crop and soil sciences at Michigan State University, analyzed the soil test results that MSU Extension sent to A&L Great Lakes Laboratories in Indiana at City Pulse’s request. Boyd said the “normal” range for arsenic in soil is between one and 50 parts per million (ppm), while for mercury it’s between .03 and .6 ppm. The results showed arsenic at 119 ppm and mercury just below .59 ppm.[10]

Lansing’s BWL is in the process of moving 450,000 cubic yards of coal ash from the Comfort St. location to a landfill operated by Granger. The excavation is expected to extend into next fall. In view of the elevated arsenic level detected outside the ash storage site, people are questioning whether the two foot high silt fences that surround the property are enough to contain the ash in the event of a heavy rainfall.[10]

Coal Bottleneck to Continue

All Michigan coal plants will depend to some degree on coal from the Powder River Basin(PRB) in Wyoming. On August 26, 2009, The Dakota Minnesota & Eastern Railroad Corp. put on hold a massive new proposed coal rail line meant to transport coal from the PRB to points east.[11]

The $6 billion railroad from the Wyoming coal fields to the Mississippi River, was meant to open up markets for another 100 million tons of coal annually. For comparison, this would be enough coal to power 50 medium size coal plants which when burned would have emitted 200 million tons of carbon dioxide (think 40 million cars).

Citizen Groups

Lansingcan1.jpg

Lansing Can Do Better is the most active citizen group involved with the BWL project. Lansing Can Do Better (LCDB) was started by a group of citizens concerned about the Lansing Board of Water and Light's rush to build another $1 billion coal-fired power plant. We are ratepayers, mothers, fathers, grandparents, students, local energy experts, religious leaders, and professors who know that Lansing can do better by first investigating in renewable energy and efficiency. The LCDB team is asking that the Lansing Board of Water and Light Advisory Panel and the Board of Commissioners:

  • Wait 24 months before making a decision on new baseload generation
  • Pursue aggressive weatherization and energy efficiency programs
  • Deploy renewable and distributed energy resources

Before we rush to build more coal plants, we need to protect our families and future against the threats of global warming and carbon dioxide by first investing in clean, renewable energy and efficiency. We believe that investing in more coal before renewable energy will hurt jobs, hurt ratepayers, and provide viable harm to public health and the environment.

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20200612191408/https://www.eia.gov/electricity/data/eia860m/archive/xls/november_generator2019.xlsx. Archived from the original on 12 June 2020. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 Lawrence Consentino, "Soot and the City" City Pulse, June 4, 2008.
  3. Michigan's 21ST Century Electric Energy Plan: Appendix – Volume II: Workgroup Reports, Michigan Public Service Commission, January 2007.
  4. Lawrence Consentino, "Burned out", City Pulse (Lansing, Michigan), August 13, 2008.
  5. "Coal Shoulder: How hard did BWL try to find an environmentalist for its pow er plant advisory committee?, Pulse, September 24, 2008.
  6. Christine Rook, "Push to go green may undo BWL plans, five other plants", Lansing State Journal, March 4, 2009.
  7. "Stopping the Coal Rush", Sierra Club, accessed May 2009. (This is a Sierra Club list of new coal plant proposals.)
  8. Moore's Park Replacement Project"BWL News Release, July 16, 2010"
  9. "BWL to Neighbors: Coal Ash Removal Project Safe" wilx.com, July 22, 2010.
  10. 10.0 10.1 Eartha Jane Melzer, "Toxins detected in soil outside Lansing coal ash storage site" The Michigan Messenger, Nov. 18, 2010.
  11. DM&E drops condemnation against Wyo landowners; railroad suspends Powder River Basin project"Dustin Bleizeffer, Caspar Star Tribune, August 26, 2009"

Additional data

To access additional data, including interactive maps of the power stations, downloadable datasets, and summary data, please visit the Global Coal Plant Tracker and the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.