Lantang Khola Yeti hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Lantang Khola Yeti hydroelectric plant is a hydroelectric power plant in pre-construction in Langtang Valley, Rasuwa District, Bagmati Zone, Bagmati Province, Nepal.
Project Details
Table 1: Project details for Lantang Khola Yeti hydroelectric plant
Status | Commissioning year | Nameplate capacity | Technology type | Operator |
---|---|---|---|---|
Pre-construction[1] | 2026 (planned)[2] | 201 MW[3] | Conventional storage[1] | Yeti Langtang Energy PVT LTD[3] |
Location
Table 2: Location details for Lantang Khola Yeti hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Langtang Valley, Rasuwa District, Bagmati Zone, Bagmati Province, Nepal[1] | Langtang River[1] | 28.1501, 85.3753 (approximate)[1] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20221020003431/http://www.doed.gov.np/license/41. Archived from the original on 20 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.power-technology.com/marketdata/langtang-khola-yeti-nepal/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20200807141204/https://www.waterpowermagazine.com/news/newschmc-signs-deal-for-langtang-khola-project-nepal-6018892. Archived from the original on 07 August 2020.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)