Las Mareas wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Las Mareas wind farm (Parque eólico Las Mareas) is a wind farm in pre-construction in Mequinenza, Zaragoza, Aragón, Spain.
Project Details
Table 1: Phase-level project details for Las Mareas wind farm
Phase name | Status | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
1 | Pre-construction[1] | 50 MW[2] | Onshore[3] | Capital Energy [100%][4] | Green Capital Power[5] |
2 | Pre-construction[6] | 50 MW[7] | Onshore[8] | Capital Energy [100%][9] | Green Capital Power[5] |
Location
Table 2: Phase-level location details for Las Mareas wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Mequinenza, Zaragoza, Aragón, Spain[10] | 41.3826, 0.2816 (approximate)[10] |
2 | Mequinenza, Zaragoza, Aragón, Spain[10] | 41.3826, 0.2816 (approximate)[10] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ https://www.evwind.es/2022/11/17/capital-energy-advances-in-the-processing-of-las-mareas-i-and-ii-two-key-wind-farms-for-its-renewable-project-in-aragon/88852 https://govclipping.com/es/aragon/boa/2023-11-27/6864-resolucion-27-octubre-2023-directora-general-energia-minas-departamento-economia-empleo-e-industria-se-otorga-autorizacion-administrativa-previa-autorizacion-construccion-parque-eolico-mareas-termino-municipal-mequinenza-zaragoza, https://www.evwind.es/2022/11/17/capital-energy-advances-in-the-processing-of-las-mareas-i-and-ii-two-key-wind-farms-for-its-renewable-project-in-aragon/88852.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://govclipping.com/es/aragon/boa/2023-11-27/6864-resolucion-27-octubre-2023-directora-general-energia-minas-departamento-economia-empleo-e-industria-se-otorga-autorizacion-administrativa-previa-autorizacion-construccion-parque-eolico-mareas-termino-municipal-mequinenza-zaragoza, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1152013501515&type=pdf https://www.aragon.es/-/parque-eolico-las-mareas-1-en-el-termino-municipal-de-mequinenza-zaragoza-, https://govclipping.com/es/aragon/boa/2023-11-27/6864-resolucion-27-octubre-2023-directora-general-energia-minas-departamento-economia-empleo-e-industria-se-otorga-autorizacion-administrativa-previa-autorizacion-construccion-parque-eolico-mareas-termino-municipal-mequinenza-zaragoza, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1152013501515&type=pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ "Parque eólico Las Mareas 1 en el término municipal de Mequinenza (Zaragoza)". Portal de Aragón. 2023-02-28. Archived from the original on 2024-03-07.
- ↑ https://www.evwind.es/2021/08/30/capital-energy-avanza-en-el-desarrollo-de-504-mw-de-energia-eolica-en-aragon,Capital%20Energy%20advances%20in%20the%20development%20of,of%20wind%20energy%20in%20Aragon&text=C%C3%A9firo%2C%20Paucali%2C%20Arlo%20and%20Argestes,almost%20600%2C000%20tons%20of%20CO6.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 "Capital Energy advances in the development of 504 MW of wind energy in Aragon". REVE News. 2021-08-30. Archived from the original on 2024-01-26.
- ↑ https://govclipping.com/es/aragon/boa/2023-11-27/6865-resolucion-2-noviembre-2023-directora-general-energia-minas-departamento-economia-empleo-e-industria-se-otorga-autorizacion-administrativa-previa-autorizacion-construccion-parque-eolico-mareas-ii-termino-municipal-mequinenza-zaragoza https://www.evwind.es/2022/11/17/capital-energy-advances-in-the-processing-of-las-mareas-i-and-ii-two-key-wind-farms-for-its-renewable-project-in-aragon/88852, https://govclipping.com/es/aragon/boa/2023-11-27/6865-resolucion-2-noviembre-2023-directora-general-energia-minas-departamento-economia-empleo-e-industria-se-otorga-autorizacion-administrativa-previa-autorizacion-construccion-parque-eolico-mareas-ii-termino-municipal-mequinenza-zaragoza.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://govclipping.com/es/aragon/boa/2023-11-27/6865-resolucion-2-noviembre-2023-directora-general-energia-minas-departamento-economia-empleo-e-industria-se-otorga-autorizacion-administrativa-previa-autorizacion-construccion-parque-eolico-mareas-ii-termino-municipal-mequinenza-zaragoza, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1152015521616&type=pdf https://www.aragon.es/-/parque-eolico-las-mareas-2-en-el-termino-municipal-de-mequinenza-zaragoza-, https://govclipping.com/es/aragon/boa/2023-11-27/6865-resolucion-2-noviembre-2023-directora-general-energia-minas-departamento-economia-empleo-e-industria-se-otorga-autorizacion-administrativa-previa-autorizacion-construccion-parque-eolico-mareas-ii-termino-municipal-mequinenza-zaragoza, https://www.boa.aragon.es/cgi-bin/EBOA/BRSCGI?CMD=VEROBJ&MLKOB=1152015521616&type=pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ "Parque eólico Las Mareas 2 en el término municipal de Mequinenza (Zaragoza)". Portal de Aragón. 2023-02-28. Archived from the original on 2024-01-26.
- ↑ https://www.evwind.es/2021/08/30/capital-energy-avanza-en-el-desarrollo-de-504-mw-de-energia-eolica-en-aragon,Capital%20Energy%20advances%20in%20the%20development%20of,of%20wind%20energy%20in%20Aragon&text=C%C3%A9firo%2C%20Paucali%2C%20Arlo%20and%20Argestes,almost%20600%2C000%20tons%20of%20CO7.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 10.0 10.1 10.2 10.3 https://www.aragon.es/-/parque-eolico-las-mareas-2-en-el-termino-municipal-de-mequinenza-zaragoza- https://www.aragon.es/-/parque-eolico-las-mareas-1-en-el-termino-municipal-de-mequinenza-zaragoza-, https://www.aragon.es/-/parque-eolico-las-mareas-2-en-el-termino-municipal-de-mequinenza-zaragoza-.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)